Description

Book Synopsis


Table of Contents

Acknowledgments xxiii

Foreword xxix

Introduction xxxi

Initial Thoughts xxxix

1 Chaos in Manufacturing 1

Problems in Manufacturing 2

And the Solutions 7

Getting Out of the Overloaded Master Plan and/or Master Schedule 16

Rescheduling the Overloaded Master Plan and/or Master Schedule 19

2 Why Master Planning and Scheduling 25

The Four Cornerstones of a Manufacturing Business 25

Between Strategy and Execution 27

What Is a Master Plan versus a Master Schedule? 31

Maximizing, Minimizing, and Optimizing 32

Objectives of Master Planning and Scheduling (If You Don’t Know Where You’re Going, Any Road Will Get You There) 33

Challenges for the Master Planner and Master Scheduler 35

Principles of Master Planning and Scheduling 37

MPS, MRPII, ERP, SCM, and ITP 39

Finding the Diamond in the Rough—Why It’s Important 58

The Four Cornerstones of Manufacturing Revisited 67

Four Levels of Planning (Sometimes Use Only Three) 68

Why Master Planning and Scheduling Is a Must in Business Excellence 74

3 The Mechanics of Master Planning and Scheduling 79

The Importance of Master Planning and Scheduling 79

The Master Planning and Scheduling Matrices 80

Master Scheduling in Action 87

Why and How Master Scheduling Drives Material Requirements Planning and Detailed Scheduling 92

The What, Why, and How of Safety Stock 99

Additional Material Planning Techniques 103

Maintaining Demand/Supply Balance Inside the Planning Time Fence 107

Master Plan and Schedule Design Criteria 113

So, What’s Next? 115

4 Managing the Supply Chain with Master Planning and Scheduling 117

The Master Planner’s and Master Scheduler’s Job 119

Exception-Driven Action Messages 125

Six (Sometimes Seven) Key Questions to Answer 129

Answering the Six (or Seven) Questions 133

Time Zones as Aids to Decision Making 134

Planning Within Master Planning and Scheduling Policy 138

No Past Dues 141

Managing with Planning Time Fences 142

Load-Leveling in Manufacturing 147

Lean Manufacturing and Continuous Improvement 150

Mixed-Model Scheduling 151

Planned Plant Shutdowns 154

5 Using the MPS Output for Make-to-Stock Products 159

The Master Schedule Screens 160

Working Make-to-Stock Master Scheduled Items 168

Time Phasing the Bills-of-Material 170

Understanding Exception-Driven Action Messages 172

Bridging Data and Judgment 180

The Seven Key Questions Revisited 184

Scheduling in a World of Many Schedules 185

From Master Planning and Scheduling to Time-Phased Material Requirements Planning 194

From Master Planning to Master Scheduling (It’s Called Master Planning and Scheduling) 199

6 Where and What to Master Plan and Master Schedule 203

Manufacturing Strategies Defined 204

Choosing the Right Manufacturing Strategy 206

Master Planning, Master Scheduling, and Product Structures 210

Multilevel Master Planning and Scheduling 213

Ensuring That Supply Plans and Schedules Are Aligned, Synchronized, and Integrated 216

Master Scheduling Capacities, Activities, and Events 224

7 Scheduling in a Flow Environment 227

Different Manufacturing Environments 228

Similarities Between Intermittent and Flow Environments 232

Product Definition 236

The Planning Process 239

Process Company Using Rough Cut Capacity Planning: An Extended Example 244

Catalysts and Recovered Material 250

Production Line Scheduling 251

Planning Multiplant Workloads 252

8 Planning Bills 255

The Overly Complex Bill-of-Material 257

Anatomy of a Planning Bill 266

Creating Demand at the Master Planning and Scheduling Level 271

9 Two-Level MPS Coupled with Other Advanced Techniques 277

The Backlog Curve 277

Identifying Demand 281

Creating the Master Plan and/or Master Schedule for Products Using a Make-to-Order Manufacturing Strategy 288

Option Overplanning 292

Calculating Projected Available Balance for Pseudo Items 294

Calculating Available-to-Promise 295

Using Available-to-Promise to Commit Customer Orders 297

Changes in Projected Available Balance 303

Option Overplanning for Products in the Make-to-Stock Environment 305

Master Planning and Scheduling Products in Make-to-Stock and Make-to-Order Environments: A Comparison 309

10 Using MPS Output for Make-to-Order Products 313

Using Planning Bills to Simplify Option Scheduling 315

The Scheduling Process 317

Master Scheduling Common Components 321

Analyzing the Detail Data 325

Balancing the Sold-Out Zone for Common Components 326

Handling Abnormal Demand 328

Action Messages 330

Working the Pseudo Options 330

Master Scheduling Purchased Items in the Planning Bill 341

Linking the Master Plan to the Master Schedule to the Material Plan 346

Manufacturing Strategies—Products in the Make-to-Order Environment 350

11 Master Planning and Scheduling in Custom-Product Environments 355

The Unique Challenges of the DTO and ETO Environments 356

The Case of New Product Introduction 358

Master Planning and Scheduling—Activities and Events 363

Prices and Promises to Keep 367

What Can Go Wrong 368

Integrating Design and Operation Activities 370

Plan Down, Replan Up 373

Make-to-Contract Environments 381

The Need for Standards—A Long Time Ago 382

When Supply Can’t Satisfy Demand 386

12 Finishing or Final Assembly Scheduling 389

Manufacturing Strategy Tied to Finishing/Final Assembly Schedules 389

Manufacturing Strategy Approaches 391

Traditional Means of Communicating the Master Plan and/or Master Schedule 395

The Role of People and Computers in Finishing and Final Assembly Scheduling—Past, Present, and Future 397

The Kanban System 399

Tying It All Together (Aggregate Integrated Business Planning Through Master Planning and Scheduling Through Detailed Production Scheduling) 403

Final Assembly or Process Routings 406

Configuring and Building to a Customer Order 408

Finishing or Final Assembly Combined Materials and Operations List 411

Choosing the Most Effective Approach 413

Master Plans versus Master Schedules versus Finishing Schedules 414

Master Scheduling Logistics (Sharing In/Out Information) 415

13 Data Integrity Requirements to Support Master Planning and Scheduling 417

What Is Data Integrity and Why Is It Important? 418

Gaining Control and Integration Points 422

The Four Pillars of Data Integrity 425

Applying the Four Pillars of Data Integrity in Support of Master Planning and Scheduling 438

Summary 452

14 Integrated Business Planning 455

Integrated Business Planning Process Elements in Brief 457

Workable, Adjustable Plans 466

Master Supply Planning 468

Integrated Business Planning and the Master Supply Schedule 470

Synchronizing and Assessing Demand and Supply 481

Measuring Accuracy and Performance 487

The Evolution of Integrated Business Planning 495

15 Resource Requirements Planning and Rough Cut Capacity Planning 499

Know Before You Go 500

Rough Cut Revealed 502

The Rough Cut Process 502

Creating the Resource Profile 505

Finalizing the Resource Profile 512

Capacity Inputs 514

Overloading Demonstrated and/or Planned Capacity 520

Rough Cut Capacity Planning at the Master Planning and Master Scheduling Levels 522

Resource Requirements and Rough Cut Capacity Planning Graphs 529

Using and Working the Rough Cut Capacity Plan 533

Simulations—Rough Cut Capacity Planning 538

Screen and Report Formats 540

Rough Cut Capacity Planning at a Process Company (Industry Example) 543

The Benefits and Limitations of Rough Cut Capacity Planning 551

Implementing the Rough Cut Capacity Planning Process 554

Closing Comments Regarding Resource Requirements Planning and Rough Cut Capacity Planning 555

16 Supply Management and Aggregate Master Planning 559

Supply Management and Master Planning in Action 565

The Impact of New Product in Supply Management and Master Planning 567

Inventory Projection and Planning 572

Will the Plan Work? 575

Product-Driven, Disaggregated Inventory Planning 577

Product-Driven, Aggregated Backlog Planning 579

Product-Driven, Disaggregated Backlog Planning 585

Production-Driven Environments 589

Reviewing and Approving the Aggregate Supply Plan 591

Interplant Product Integration 592

Key Performance Metrics—Calculations, Colors, Standards 597

Should Companies Have Supply Managers and/or Master Planners? 598

17 Demand Management and Aggregate Master Planning 603

What Is Demand Management? 603

The Impact of New Product in Demand Management 608

Master Launch Plan and Pipeline Funnel Examples for New Products 609

Problems with the Demand Forecast 614

The Impact of Demand Bias on Supply Chain Management 615

Coping with Forecast Inaccuracies 617

Reviewing and Approving the Aggregate Demand Plan 619

It’s About Quantities 621

It’s About Time 623

Demand and Forecast Adjustment 631

Customer Order Processing with Process Flow Diagram Example 637

Possible Problems Caused by Abnormal Demand 640

Customer Linking 642

Getting Sales Pipeline Control 645

Distribution Resource/Requirements Planning 646

Available-to-Promise 655

ATP with Two Demand Streams 659

Should Companies Have Demand Managers? 663

18 The Proven Path to a Successful MPS Implementation (Phase 1) 669

From the Original Implementation Plan to the Current Proven Path 669

The Proven Path to Successful Operational Excellence 671

The Decision Point 673

Going on the Air 675

The Former Proven Path to Master Planning and Scheduling in a Class A Operational Excellence Environment 676

The Journey to Excellence—Today and Tomorrow 679

Oliver Wight’s Class A Integrated Planning and Control Milestone 681

The Proven Path (3rd Version) to Successful Supply Chain Management and Master Planning and Scheduling Implementation 683

Phase 1: Lead Phase (Understanding and Committing) 685

Company Vision of Operations (A Modified Client Example) 687

Case for Change (A Modified Excerpt from a Client Example) 696

Segue to . . . 702

The Proven Path to a Successful MPS Implementation (Phase 2) Influencers Transform MPS Process Design and Structure 702

19 The Proven Path to a Successful MPS Implementation (Phase 2) 705

Methodology for Implementing Change Revisited 705

Phase 2: Transform Phase (Process Designing and Structuring) 707

Policy, Flow Diagrams, Procedures, Work Instructions, and Metrics Defined 731

Segue to . . . 741

The Proven Path to a Successful MPS Implementation (Phase 3) Users Own MPS Launch and Measures 741

20 The Proven Path to a Successful MPS Implementation (Phase 3) 743

Methodology for Implementing Change Revisited—Again! 743

Phase 3: Own Phase (Launching and Measuring) 745

Deterrents to Successful Implementation of the Master Planning and Scheduling Process and Supporting System Technology 762

The Master Planner’s and Master Scheduler’s List of Responsibilities 764

Putting It All Together to Ensure Success—Guaranteed 768

An Aggressive Master Plan and Schedule for the MPS Implementation 771

The Variables of a Master Planning and Scheduling Implementation 774

Epilogue

Order from Chaos 779

Final Thoughts – People and Process and Profession 783

Appendix A Master Planning and Scheduling Process and Performance Standards 809

Appendix B Master Planning and Scheduling Improvement Initiative Task Listing 817

Appendix C Master Planning and Scheduling Policy, Procedure, and Flow Diagram 827

Appendix D Master Planning and Scheduling 831

Appendix E Supply Chain Management Overall Process Flow Diagram (An Example) 843

Appendix F Master Planning and Scheduling Process Flow Diagram Examples 845

Appendix G Master Planning and Scheduling RACI Examples 851

Appendix H Master Planning and Scheduling Spinoff Task Team Charter 855

Appendix I Master Planning and Scheduling Oliver Wight International Offerings Founders’ and Co-Authors’ Biographies 859

Glossary 865

Index 895

Master Planning and Scheduling

    Product form

    £103.50

    Includes FREE delivery

    RRP £115.00 – you save £11.50 (10%)

    Order before 4pm today for delivery by Sat 4 Jul 2026.

    A Hardback by John F. Proud, Eric Deutsch

    1 in stock

      Trusted by thousands of customers. See 2,385+ Customer Reviews

      View other formats and editions of Master Planning and Scheduling by John F. Proud

      Publisher: John Wiley & Sons Inc
      Publication Date: 04/02/2022
      ISBN13: 9781119809418, 978-1119809418
      ISBN10: 111980941X

      Description

      Book Synopsis


      Table of Contents

      Acknowledgments xxiii

      Foreword xxix

      Introduction xxxi

      Initial Thoughts xxxix

      1 Chaos in Manufacturing 1

      Problems in Manufacturing 2

      And the Solutions 7

      Getting Out of the Overloaded Master Plan and/or Master Schedule 16

      Rescheduling the Overloaded Master Plan and/or Master Schedule 19

      2 Why Master Planning and Scheduling 25

      The Four Cornerstones of a Manufacturing Business 25

      Between Strategy and Execution 27

      What Is a Master Plan versus a Master Schedule? 31

      Maximizing, Minimizing, and Optimizing 32

      Objectives of Master Planning and Scheduling (If You Don’t Know Where You’re Going, Any Road Will Get You There) 33

      Challenges for the Master Planner and Master Scheduler 35

      Principles of Master Planning and Scheduling 37

      MPS, MRPII, ERP, SCM, and ITP 39

      Finding the Diamond in the Rough—Why It’s Important 58

      The Four Cornerstones of Manufacturing Revisited 67

      Four Levels of Planning (Sometimes Use Only Three) 68

      Why Master Planning and Scheduling Is a Must in Business Excellence 74

      3 The Mechanics of Master Planning and Scheduling 79

      The Importance of Master Planning and Scheduling 79

      The Master Planning and Scheduling Matrices 80

      Master Scheduling in Action 87

      Why and How Master Scheduling Drives Material Requirements Planning and Detailed Scheduling 92

      The What, Why, and How of Safety Stock 99

      Additional Material Planning Techniques 103

      Maintaining Demand/Supply Balance Inside the Planning Time Fence 107

      Master Plan and Schedule Design Criteria 113

      So, What’s Next? 115

      4 Managing the Supply Chain with Master Planning and Scheduling 117

      The Master Planner’s and Master Scheduler’s Job 119

      Exception-Driven Action Messages 125

      Six (Sometimes Seven) Key Questions to Answer 129

      Answering the Six (or Seven) Questions 133

      Time Zones as Aids to Decision Making 134

      Planning Within Master Planning and Scheduling Policy 138

      No Past Dues 141

      Managing with Planning Time Fences 142

      Load-Leveling in Manufacturing 147

      Lean Manufacturing and Continuous Improvement 150

      Mixed-Model Scheduling 151

      Planned Plant Shutdowns 154

      5 Using the MPS Output for Make-to-Stock Products 159

      The Master Schedule Screens 160

      Working Make-to-Stock Master Scheduled Items 168

      Time Phasing the Bills-of-Material 170

      Understanding Exception-Driven Action Messages 172

      Bridging Data and Judgment 180

      The Seven Key Questions Revisited 184

      Scheduling in a World of Many Schedules 185

      From Master Planning and Scheduling to Time-Phased Material Requirements Planning 194

      From Master Planning to Master Scheduling (It’s Called Master Planning and Scheduling) 199

      6 Where and What to Master Plan and Master Schedule 203

      Manufacturing Strategies Defined 204

      Choosing the Right Manufacturing Strategy 206

      Master Planning, Master Scheduling, and Product Structures 210

      Multilevel Master Planning and Scheduling 213

      Ensuring That Supply Plans and Schedules Are Aligned, Synchronized, and Integrated 216

      Master Scheduling Capacities, Activities, and Events 224

      7 Scheduling in a Flow Environment 227

      Different Manufacturing Environments 228

      Similarities Between Intermittent and Flow Environments 232

      Product Definition 236

      The Planning Process 239

      Process Company Using Rough Cut Capacity Planning: An Extended Example 244

      Catalysts and Recovered Material 250

      Production Line Scheduling 251

      Planning Multiplant Workloads 252

      8 Planning Bills 255

      The Overly Complex Bill-of-Material 257

      Anatomy of a Planning Bill 266

      Creating Demand at the Master Planning and Scheduling Level 271

      9 Two-Level MPS Coupled with Other Advanced Techniques 277

      The Backlog Curve 277

      Identifying Demand 281

      Creating the Master Plan and/or Master Schedule for Products Using a Make-to-Order Manufacturing Strategy 288

      Option Overplanning 292

      Calculating Projected Available Balance for Pseudo Items 294

      Calculating Available-to-Promise 295

      Using Available-to-Promise to Commit Customer Orders 297

      Changes in Projected Available Balance 303

      Option Overplanning for Products in the Make-to-Stock Environment 305

      Master Planning and Scheduling Products in Make-to-Stock and Make-to-Order Environments: A Comparison 309

      10 Using MPS Output for Make-to-Order Products 313

      Using Planning Bills to Simplify Option Scheduling 315

      The Scheduling Process 317

      Master Scheduling Common Components 321

      Analyzing the Detail Data 325

      Balancing the Sold-Out Zone for Common Components 326

      Handling Abnormal Demand 328

      Action Messages 330

      Working the Pseudo Options 330

      Master Scheduling Purchased Items in the Planning Bill 341

      Linking the Master Plan to the Master Schedule to the Material Plan 346

      Manufacturing Strategies—Products in the Make-to-Order Environment 350

      11 Master Planning and Scheduling in Custom-Product Environments 355

      The Unique Challenges of the DTO and ETO Environments 356

      The Case of New Product Introduction 358

      Master Planning and Scheduling—Activities and Events 363

      Prices and Promises to Keep 367

      What Can Go Wrong 368

      Integrating Design and Operation Activities 370

      Plan Down, Replan Up 373

      Make-to-Contract Environments 381

      The Need for Standards—A Long Time Ago 382

      When Supply Can’t Satisfy Demand 386

      12 Finishing or Final Assembly Scheduling 389

      Manufacturing Strategy Tied to Finishing/Final Assembly Schedules 389

      Manufacturing Strategy Approaches 391

      Traditional Means of Communicating the Master Plan and/or Master Schedule 395

      The Role of People and Computers in Finishing and Final Assembly Scheduling—Past, Present, and Future 397

      The Kanban System 399

      Tying It All Together (Aggregate Integrated Business Planning Through Master Planning and Scheduling Through Detailed Production Scheduling) 403

      Final Assembly or Process Routings 406

      Configuring and Building to a Customer Order 408

      Finishing or Final Assembly Combined Materials and Operations List 411

      Choosing the Most Effective Approach 413

      Master Plans versus Master Schedules versus Finishing Schedules 414

      Master Scheduling Logistics (Sharing In/Out Information) 415

      13 Data Integrity Requirements to Support Master Planning and Scheduling 417

      What Is Data Integrity and Why Is It Important? 418

      Gaining Control and Integration Points 422

      The Four Pillars of Data Integrity 425

      Applying the Four Pillars of Data Integrity in Support of Master Planning and Scheduling 438

      Summary 452

      14 Integrated Business Planning 455

      Integrated Business Planning Process Elements in Brief 457

      Workable, Adjustable Plans 466

      Master Supply Planning 468

      Integrated Business Planning and the Master Supply Schedule 470

      Synchronizing and Assessing Demand and Supply 481

      Measuring Accuracy and Performance 487

      The Evolution of Integrated Business Planning 495

      15 Resource Requirements Planning and Rough Cut Capacity Planning 499

      Know Before You Go 500

      Rough Cut Revealed 502

      The Rough Cut Process 502

      Creating the Resource Profile 505

      Finalizing the Resource Profile 512

      Capacity Inputs 514

      Overloading Demonstrated and/or Planned Capacity 520

      Rough Cut Capacity Planning at the Master Planning and Master Scheduling Levels 522

      Resource Requirements and Rough Cut Capacity Planning Graphs 529

      Using and Working the Rough Cut Capacity Plan 533

      Simulations—Rough Cut Capacity Planning 538

      Screen and Report Formats 540

      Rough Cut Capacity Planning at a Process Company (Industry Example) 543

      The Benefits and Limitations of Rough Cut Capacity Planning 551

      Implementing the Rough Cut Capacity Planning Process 554

      Closing Comments Regarding Resource Requirements Planning and Rough Cut Capacity Planning 555

      16 Supply Management and Aggregate Master Planning 559

      Supply Management and Master Planning in Action 565

      The Impact of New Product in Supply Management and Master Planning 567

      Inventory Projection and Planning 572

      Will the Plan Work? 575

      Product-Driven, Disaggregated Inventory Planning 577

      Product-Driven, Aggregated Backlog Planning 579

      Product-Driven, Disaggregated Backlog Planning 585

      Production-Driven Environments 589

      Reviewing and Approving the Aggregate Supply Plan 591

      Interplant Product Integration 592

      Key Performance Metrics—Calculations, Colors, Standards 597

      Should Companies Have Supply Managers and/or Master Planners? 598

      17 Demand Management and Aggregate Master Planning 603

      What Is Demand Management? 603

      The Impact of New Product in Demand Management 608

      Master Launch Plan and Pipeline Funnel Examples for New Products 609

      Problems with the Demand Forecast 614

      The Impact of Demand Bias on Supply Chain Management 615

      Coping with Forecast Inaccuracies 617

      Reviewing and Approving the Aggregate Demand Plan 619

      It’s About Quantities 621

      It’s About Time 623

      Demand and Forecast Adjustment 631

      Customer Order Processing with Process Flow Diagram Example 637

      Possible Problems Caused by Abnormal Demand 640

      Customer Linking 642

      Getting Sales Pipeline Control 645

      Distribution Resource/Requirements Planning 646

      Available-to-Promise 655

      ATP with Two Demand Streams 659

      Should Companies Have Demand Managers? 663

      18 The Proven Path to a Successful MPS Implementation (Phase 1) 669

      From the Original Implementation Plan to the Current Proven Path 669

      The Proven Path to Successful Operational Excellence 671

      The Decision Point 673

      Going on the Air 675

      The Former Proven Path to Master Planning and Scheduling in a Class A Operational Excellence Environment 676

      The Journey to Excellence—Today and Tomorrow 679

      Oliver Wight’s Class A Integrated Planning and Control Milestone 681

      The Proven Path (3rd Version) to Successful Supply Chain Management and Master Planning and Scheduling Implementation 683

      Phase 1: Lead Phase (Understanding and Committing) 685

      Company Vision of Operations (A Modified Client Example) 687

      Case for Change (A Modified Excerpt from a Client Example) 696

      Segue to . . . 702

      The Proven Path to a Successful MPS Implementation (Phase 2) Influencers Transform MPS Process Design and Structure 702

      19 The Proven Path to a Successful MPS Implementation (Phase 2) 705

      Methodology for Implementing Change Revisited 705

      Phase 2: Transform Phase (Process Designing and Structuring) 707

      Policy, Flow Diagrams, Procedures, Work Instructions, and Metrics Defined 731

      Segue to . . . 741

      The Proven Path to a Successful MPS Implementation (Phase 3) Users Own MPS Launch and Measures 741

      20 The Proven Path to a Successful MPS Implementation (Phase 3) 743

      Methodology for Implementing Change Revisited—Again! 743

      Phase 3: Own Phase (Launching and Measuring) 745

      Deterrents to Successful Implementation of the Master Planning and Scheduling Process and Supporting System Technology 762

      The Master Planner’s and Master Scheduler’s List of Responsibilities 764

      Putting It All Together to Ensure Success—Guaranteed 768

      An Aggressive Master Plan and Schedule for the MPS Implementation 771

      The Variables of a Master Planning and Scheduling Implementation 774

      Epilogue

      Order from Chaos 779

      Final Thoughts – People and Process and Profession 783

      Appendix A Master Planning and Scheduling Process and Performance Standards 809

      Appendix B Master Planning and Scheduling Improvement Initiative Task Listing 817

      Appendix C Master Planning and Scheduling Policy, Procedure, and Flow Diagram 827

      Appendix D Master Planning and Scheduling 831

      Appendix E Supply Chain Management Overall Process Flow Diagram (An Example) 843

      Appendix F Master Planning and Scheduling Process Flow Diagram Examples 845

      Appendix G Master Planning and Scheduling RACI Examples 851

      Appendix H Master Planning and Scheduling Spinoff Task Team Charter 855

      Appendix I Master Planning and Scheduling Oliver Wight International Offerings Founders’ and Co-Authors’ Biographies 859

      Glossary 865

      Index 895

      Recently viewed products

      © 2026 Book Curl

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account