Description

Book Synopsis
The RICS New Rules of Measurement mean that the construction industry now has a way of allowing a more consistent approach to the measurement and estimating of buildings from the start of a project, right through until the end, and beyond.

Table of Contents

Foreword by Allan Ashworth ix

Preface xi

Acknowledgements xiii

List of Tables and Diagrams xv

Glossary of Terms xix

1 Introduction 1

1.1 Introduction 1

1.2 Standard methods of measurement 4

1.3 Pricing 6

2 A Practical Introduction to Measurement 7

2.1 A practical introduction to measurement 7

2.2 Measurement procedure 11

3 Code of Measuring Practice 15

3.1 Introduction 15

3.2 The purpose of the Code 16

3.3 Measurement 18

3.4 Good practice 23

3.5 Practical application: GIFA London Road 33

3.6 Self-assessment exercise: GIFA London Road 35

4 How to Use the New Rules of Measurement 1 37

4.1 Introduction 37

4.2 Framework 39

4.3 Estimates 44

4.4 Cost plans 46

4.5 Information 50

4.6 Practical application: Included and excluded 51

4.7 Self-assessment exercise: Conversion to NRM 53

5 NRM 1 Estimates 55

5.1 Practice and procedure 55

5.2 Method of measurement 60

5.3 Practical application: Estimate London Road Basement 63

5.4 Self-assessment exercise: Estimate London Road RC Frame 69

6 NRM 1 Cost Plans 71

6.1 Practice and procedure 71

6.2 Elements 73

6.3 Method of measurement for cost plans 76

6.4 Cost plans 82

6.5 Practical application: Cost Plan London Road Basement 84

6.6 Self-assessment exercise: Cost Plan London Road RC Frame 93

7 Information 95

7.1 Introduction 95

7.2 Information requirements for estimates 96

7.3 Information required for the cost plans 98

7.4 Progressive provision of information 108

8 Preliminaries, Risk, Overheads and Profit 115

8.1 Introduction 115

8.2 Preliminaries 115

8.3 Risk 123

8.4 Overheads and profit 128

8.5 Practical example: Site based preliminaries 128

8.6 Self-assessment exercise: Weekly running costs 130

9 Unit Rates 131

9.1 Introduction 131

9.2 Labour rates 132

9.3 Labour constants 135

9.4 Materials 136

9.5 Plant 137

9.6 Practical application: For concrete, brickwork, partitioning, roofing, windows 139

9.7 Self-assessment exercise: Reinforcement 151

10 Cost Analyses 153

10.1 Introduction 153

10.2 Types of indices 154

10.3 Requirements of indices 156

10.4 Problems with indices 157

10.5 Using indices to adjust estimates 159

10.6 Practical application: Cost adjustment for customer service centre 165

10.7 Self-assessment exercise: Cost adjustment for educational building 176

Appendices

1. London Road drawing: No. SDCO/1/01 Site Layout, Size A 1 185

2. London Road drawing: No. SDCO/1/02 Plan, Elevation and Section. Size A1 187

References 189

Index 191

Estimating and Cost Planning Using the New Rules

Product form

£44.60

Includes FREE delivery

RRP £46.95 – you save £2.35 (5%)

Order before 4pm tomorrow for delivery by Fri 9 Jan 2026.

A Paperback / softback by Sean D. C. Ostrowski

1 in stock


    View other formats and editions of Estimating and Cost Planning Using the New Rules by Sean D. C. Ostrowski

    Publisher: John Wiley and Sons Ltd
    Publication Date: 23/08/2013
    ISBN13: 9781118332658, 978-1118332658
    ISBN10: 1118332652

    Description

    Book Synopsis
    The RICS New Rules of Measurement mean that the construction industry now has a way of allowing a more consistent approach to the measurement and estimating of buildings from the start of a project, right through until the end, and beyond.

    Table of Contents

    Foreword by Allan Ashworth ix

    Preface xi

    Acknowledgements xiii

    List of Tables and Diagrams xv

    Glossary of Terms xix

    1 Introduction 1

    1.1 Introduction 1

    1.2 Standard methods of measurement 4

    1.3 Pricing 6

    2 A Practical Introduction to Measurement 7

    2.1 A practical introduction to measurement 7

    2.2 Measurement procedure 11

    3 Code of Measuring Practice 15

    3.1 Introduction 15

    3.2 The purpose of the Code 16

    3.3 Measurement 18

    3.4 Good practice 23

    3.5 Practical application: GIFA London Road 33

    3.6 Self-assessment exercise: GIFA London Road 35

    4 How to Use the New Rules of Measurement 1 37

    4.1 Introduction 37

    4.2 Framework 39

    4.3 Estimates 44

    4.4 Cost plans 46

    4.5 Information 50

    4.6 Practical application: Included and excluded 51

    4.7 Self-assessment exercise: Conversion to NRM 53

    5 NRM 1 Estimates 55

    5.1 Practice and procedure 55

    5.2 Method of measurement 60

    5.3 Practical application: Estimate London Road Basement 63

    5.4 Self-assessment exercise: Estimate London Road RC Frame 69

    6 NRM 1 Cost Plans 71

    6.1 Practice and procedure 71

    6.2 Elements 73

    6.3 Method of measurement for cost plans 76

    6.4 Cost plans 82

    6.5 Practical application: Cost Plan London Road Basement 84

    6.6 Self-assessment exercise: Cost Plan London Road RC Frame 93

    7 Information 95

    7.1 Introduction 95

    7.2 Information requirements for estimates 96

    7.3 Information required for the cost plans 98

    7.4 Progressive provision of information 108

    8 Preliminaries, Risk, Overheads and Profit 115

    8.1 Introduction 115

    8.2 Preliminaries 115

    8.3 Risk 123

    8.4 Overheads and profit 128

    8.5 Practical example: Site based preliminaries 128

    8.6 Self-assessment exercise: Weekly running costs 130

    9 Unit Rates 131

    9.1 Introduction 131

    9.2 Labour rates 132

    9.3 Labour constants 135

    9.4 Materials 136

    9.5 Plant 137

    9.6 Practical application: For concrete, brickwork, partitioning, roofing, windows 139

    9.7 Self-assessment exercise: Reinforcement 151

    10 Cost Analyses 153

    10.1 Introduction 153

    10.2 Types of indices 154

    10.3 Requirements of indices 156

    10.4 Problems with indices 157

    10.5 Using indices to adjust estimates 159

    10.6 Practical application: Cost adjustment for customer service centre 165

    10.7 Self-assessment exercise: Cost adjustment for educational building 176

    Appendices

    1. London Road drawing: No. SDCO/1/01 Site Layout, Size A 1 185

    2. London Road drawing: No. SDCO/1/02 Plan, Elevation and Section. Size A1 187

    References 189

    Index 191

    Recently viewed products

    © 2026 Book Curl

      • American Express
      • Apple Pay
      • Diners Club
      • Discover
      • Google Pay
      • Maestro
      • Mastercard
      • PayPal
      • Shop Pay
      • Union Pay
      • Visa

      Login

      Forgot your password?

      Don't have an account yet?
      Create account