Description

Book Synopsis
The first five Kestrel Railway Books volumes by David Larkin looked at the revenue-earning wagon fleet operated by British Railways and its immediate successor, British Rail. This volume is the third of three looking at the substantial fleet of specially-designed wagons that were used for track maintenance, and covers a significant change to the wagon fleet from 1978 to 1994.Concurrent with British Rail freight operations generally, there was positive move towards fully-fitted trains on all regions of the system. On working ballast trains, this could be accomodated by using the vacuum-braked examples of suitable designs, and the early years of the period saw the gradual elimination of unfitted stock, either through withdrawal or by the application of automatic braking systems. To get Civil Engineers materials to the various depots, air-braked stock was either built new, transferrred from the revenue-earning fleet or, eventually, rebuilt from exisitng stock. Finally, the on-track plant fleet became more standardised and a new concept of ''virtual quarries'' was introduced, where ballast was stockpiled at specified yards and reloaded into hopper wagons or other types at those locations, rather than at actual quarries, such as Meldon.

Civil Engineers Wagons Volume 3: Later British

    Product form

    £13.50

    Includes FREE delivery

    RRP £15.00 – you save £1.50 (10%)

    Order before 4pm today for delivery by Fri 19 Jun 2026.

    A Paperback / softback by David Larkin

    1 in stock

      Trusted by thousands of customers. See 2,385+ Customer Reviews

      View other formats and editions of Civil Engineers Wagons Volume 3: Later British by David Larkin

      Publisher: Kestrel Railway Books
      Publication Date: 09/05/2013
      ISBN13: 9781905505258, 978-1905505258
      ISBN10: 1905505256

      Description

      Book Synopsis
      The first five Kestrel Railway Books volumes by David Larkin looked at the revenue-earning wagon fleet operated by British Railways and its immediate successor, British Rail. This volume is the third of three looking at the substantial fleet of specially-designed wagons that were used for track maintenance, and covers a significant change to the wagon fleet from 1978 to 1994.Concurrent with British Rail freight operations generally, there was positive move towards fully-fitted trains on all regions of the system. On working ballast trains, this could be accomodated by using the vacuum-braked examples of suitable designs, and the early years of the period saw the gradual elimination of unfitted stock, either through withdrawal or by the application of automatic braking systems. To get Civil Engineers materials to the various depots, air-braked stock was either built new, transferrred from the revenue-earning fleet or, eventually, rebuilt from exisitng stock. Finally, the on-track plant fleet became more standardised and a new concept of ''virtual quarries'' was introduced, where ballast was stockpiled at specified yards and reloaded into hopper wagons or other types at those locations, rather than at actual quarries, such as Meldon.

      Recently viewed products

      © 2026 Book Curl

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account