Description

Book Synopsis
The Southern Region of British Railways had long sought to design a locomotive capable of working on electrified lines and non-electrified station yards and sidings. In 1959 British Railways approved a design, designated Class HA, later British Railways Class 73, which combined the electrical equipment of the latest EMU design with the standard English Electric diesel engine in one bodyshell. An initial order was placed for six locomotives but allocated to Eastleigh Carriage and Wagon Works because the design used stock components normally found on the multiple unit fleet.The locomotives were released to traffic during February 1962 and were allocated to Stewarts Lane depot from where they powered the mundane duties of freight, parcels and empty stock services. They also tested the principle of high-speed propulsion of passenger trains prior to the adoption of the principle for the electrification of the Waterloo Weymouth line as far as Poole. Included in this scheme was the ordering

The Southern Region B R Class 73 and 74

    Product form

    £28.50

    Includes FREE delivery

    RRP £30.00 – you save £1.50 (5%)

    Order before 4pm today for delivery by Wed 12 Aug 2026.

    A Hardback by Fred Kerr

    Out of stock

      Trusted by thousands of customers. See 2,385+ Customer Reviews

      View other formats and editions of The Southern Region B R Class 73 and 74 by Fred Kerr

      Publisher: Pen & Sword Books Ltd
      Publication Date: Publication Date: 24/10/2023
      ISBN13: 9781399048811, 978-1399048811
      ISBN10: 1399048813

      Description

      Book Synopsis
      The Southern Region of British Railways had long sought to design a locomotive capable of working on electrified lines and non-electrified station yards and sidings. In 1959 British Railways approved a design, designated Class HA, later British Railways Class 73, which combined the electrical equipment of the latest EMU design with the standard English Electric diesel engine in one bodyshell. An initial order was placed for six locomotives but allocated to Eastleigh Carriage and Wagon Works because the design used stock components normally found on the multiple unit fleet.The locomotives were released to traffic during February 1962 and were allocated to Stewarts Lane depot from where they powered the mundane duties of freight, parcels and empty stock services. They also tested the principle of high-speed propulsion of passenger trains prior to the adoption of the principle for the electrification of the Waterloo Weymouth line as far as Poole. Included in this scheme was the ordering

      Recently viewed products

      © 2026 Book Curl

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account