Description

Book Synopsis
Provides a thorough and up-to-date description of Managed Aquifer Recharge (MAR) projects. The standard includes details on planning, design, construction, operation, monitoring, and closure of MAR projects, along with background information on groundwater and MAR concepts. It also describes the economic, environmental, and legal considerations.

Table of Contents
  • Preface
  • Acknowledgments
  • 1 Introduction
  • 1.1 Purpose
  • 1.2 Scope
  • 1.3 Organization of Document
  • 2 Groundwater Fundamentals and Occurrence
  • 2.1 Hydrologic Cycle
  • 2.2 Groundwater Occurrence and Use
  • 2.3 Groundwater Movement
  • 2.3.1 Groundwater Recharge
  • 2.3.2 Groundwater Storage
  • 2.3.3 Groundwater Discharge
  • 2.4 Groundwater Quality
  • 3 Managed Aquifer Recharge Concepts
  • 3.1 Purposes and Objectives
  • 3.2 Components of a MAR System
  • 3.3 Sources of Recharge Water
  • 3.4 Pretreatment
  • 3.5 Recharge
  • 3.5.1 Surface Infiltration
  • 3.5.2 Vadose (Unsaturated) Zone Recharge
  • 3.5.3 Saturated Zone Recharge
  • 3.6 Subsurface Storage
  • 3.7 Recovery
  • 3.8 Post-treatment
  • 3.9 End Uses
  • 4 Planning
  • 4.1 Initial Project Scoping
  • 4.1.1 Define MAR Objectives
  • 4.1.2 Preliminary Conceptual Plan
  • 4.2 Initial Planning Activities
  • 4.2.1 Develop Evaluation Criteria
  • 4.2.2 Example Water Sources and Demand Criteria
  • Example Site Hydrogeology Criteria
  • 4.2.4 Example Environmental Criteria
  • 4.2.5 Example Implementation Criteria
  • 4.2.6 Example Regulatory Criteria
  • 4.2.7 Data Gathering for Criteria Evaluation
  • 4.3 Detailed Planning: Identify Final Potential MAR Project Sites
  • 4.3.1 Initial Project Site Screening
  • 4.3.2 Detailed Evaluation
  • 4.3.3 Selection of Sites for Feasibility Studies
  • 4.3.4 Public Participation
  • 4.3.5 Documentation
  • 5 Design and Testing
  • 5.1 Design Phases
  • 5.1.1 Conceptual Design
  • 5.1.2 Preliminary Design
  • 5.1.3 Final Design
  • 5.1.4 Computer Modeling for Design
  • 5.2 Design Considerations for Surface Facilities
  • 5.2.1 Hydrogeology
  • 5.2.2 Site Location, Size, Layout, and Operational Flexibility
  • 5.2.3 Basin Design
  • 5.2.4 Source Water
  • 5.2.5 Water Quality
  • 5.2.6 Pre- and Posttreatment in Sedimentation Basins
  • 5.2.7 Flow Structures
  • 5.2.8 Flow Measurement
  • 5.2.9 Maintenance
  • 5.2.10 Mound Management
  • 5.2.11 Groundwater Monitoring
  • 5.2.12 Regulatory and Water Rights
  • 5.3 Design Considerations for Subsurface Facilities
  • 5.3.1 Hydrogeology
  • 5.3.2 Well Field Layout
  • 5.3.3 Well Design
  • 5.3.4 Source Water
  • 5.3.5 Water Quality and Compatibility
  • 5.3.6 Water Treatment
  • 5.3.7 Well Pumps and Piping
  • 5.3.8 Corrosion Protection
  • 5.3.9 Flow Measurement
  • 5.3.10 Maintenance
  • 5.3.11 Mound Management
  • 5.3.12 Groundwater Monitoring
  • 5.3.13 Regulatory and Water Rights
  • 5.4 Pilot Testing
  • 5.5 Design Documents
  • 5.5.1 Preparation of Detailed Plans and Specifications
  • 5.5.2 MAR Project Operation and Maintenance Plan
  • 5.5.3 Periodic Review Schedule
  • 5.5.4 Project Life
  • 6 Construction, Monitoring, and Records

    6.1 Site Preparation

  • 6.2 Aquifer Connection for Surface Facilities
  • 6.2.1 Site Excavation and Grading
  • 6.2.2 Flow Structures and Piping
  • 6.2.3 Facility Start-Up and Testing
  • 6.3 Aquifer Connection for Subsurface Facilities
  • 6.3.1 Drilling
  • 6.3.2 Well Construction and Development
  • 6.3.3 Aquifer and Well Performance Testing
  • 6.3.4 Installation of Pump and Piping
  • 6.3.5 Facility Start-Up and Testing
  • 6.4 Electrical and SCADA System
  • 6.5 Water Treatment Facilities
  • 6.5.1 Common Water Treatment Issues
  • 6.5.2 Facility Startup and Testing
  • 6.6 Monitoring Equipment
  • 6.7 Construction Records
  • 7 Operations and Maintenance of MAR Facilities
  • 7.1 Start-Up and Training
  • 7.1.1 Start-Up for Surface Recharge Facilities
  • 7.1.2 Startup for Subsurface Recharge Facilities
  • 7.1.3 Operator Training
  • 7.2 Operations and Maintenance for Surface Facilities
  • 7.2.1 Operational Data and Analyses to Evaluate System Performance
  • 7.2.2 Issues Affecting Surface MAR Operations
  • 7.2.3 Clogging
  • 7.2.4 Shallow Groundwater Levels
  • 7.2.5 Undesirable Health Effects
  • 7.2.6 Facility Integrity
  • 7.2.7 Site Security
  • 7.3 Operations and Maintenance for Subsurface Facilities
  • 7.3.1 Operational Data and Analyses to Evaluate System Performance
  • 7.3.2 Issues Affecting Subsurface MAR Operations
  • 7.3.3 Clogging of Recharge Wells
  • 7.3.4 Clogging of a Vadose Zone Well
  • 7.3.5 Redevelopment of Recharge Wells
  • 7.3.6 Sand Production
  • 7.3.7 Site Security
  • 7.3.8 Well Shutdown
  • 7.4 Water Quality Monitoring and Treatment
  • 7.4.1 Monitoring
  • 7.4.2 Treatment
  • 8 Facility Closure
  • 8.1 Surface Infiltration Facilities
  • 8.2 Subsurface Facilities
  • 9 Data Collection and Analysis
  • 9.1 Data Collection
  • 9.2 Data Collection Phases
  • 9.2.1 Planning Phase
  • 9.2.1.1 Prefeasibility Planning Phase
  • 9.2.1.2 Feasibility Planning Phase
  • 9.2.2 Design Phase
  • 9.2.3 Construction Phase
  • 9.2.4 Operations Phase
  • 9.2.5 Closure Phase
  • 9.3 Data Organization and Management
  • 9.4 Data Needs for MAR Feasibility Studies
  • 9.4.1 Source Water
  • 9.4.2 Recharge Method
  • 9.4.3 Aquifer Storage Recovery
  • 9.4.4 Impacts
  • 9.5 Data Analysis
  • 9.5.1 Source Water Delivery Analysis
  • 9.5.2 Estimating Recharge and Recovery Volumes and Efficiency
  • 9.6 Modeling
  • 9.6.1 Mass Balance Models
  • 9.6.2 Numerical Models
  • 9.6.3 Data Collection for Modeling
  • 9.6.4 Determining Sensitive Variables
  • 9.6.5 Data Collection for Uncertainty Analysis
  • 9.6.6 Geochemical Modeling
  • 9.7 Monitoring and Compliance Data
  • 9.8 Operational Data Collection
  • 9.9 Data Collection to Evaluate Performance
  • 9.10 Reporting
  • Appendixes
  • Appendix A. Glossary of Groundwater Terms
  • Appendix B. Notations and Symbols
  • Appendix C. MAR Regulations in the United States
  • Appendix D. Case Studies
  • References
  • Index

    Standard Guidelines for Managed Aquifer Recharge

      Product form

      £96.75

      Includes FREE delivery

      RRP £12,900.00 – you save £12,803.25 (99%)

      Order before 4pm today for delivery by Fri 7 Aug 2026.

      A Paperback by American Societ

      1 in stock

        Trusted by thousands of customers. See 2,385+ Customer Reviews

        View other formats and editions of Standard Guidelines for Managed Aquifer Recharge by American Societ

        Publisher: American Society of Civil Engineers
        Publication Date: Publication Date: 5/18/2020 12:00:00 AM
        ISBN13: 9780784415283, 978-0784415283
        ISBN10: 0784415285

        Description

        Book Synopsis
        Provides a thorough and up-to-date description of Managed Aquifer Recharge (MAR) projects. The standard includes details on planning, design, construction, operation, monitoring, and closure of MAR projects, along with background information on groundwater and MAR concepts. It also describes the economic, environmental, and legal considerations.

        Table of Contents
        • Preface
        • Acknowledgments
        • 1 Introduction
        • 1.1 Purpose
        • 1.2 Scope
        • 1.3 Organization of Document
        • 2 Groundwater Fundamentals and Occurrence
        • 2.1 Hydrologic Cycle
        • 2.2 Groundwater Occurrence and Use
        • 2.3 Groundwater Movement
        • 2.3.1 Groundwater Recharge
        • 2.3.2 Groundwater Storage
        • 2.3.3 Groundwater Discharge
        • 2.4 Groundwater Quality
        • 3 Managed Aquifer Recharge Concepts
        • 3.1 Purposes and Objectives
        • 3.2 Components of a MAR System
        • 3.3 Sources of Recharge Water
        • 3.4 Pretreatment
        • 3.5 Recharge
        • 3.5.1 Surface Infiltration
        • 3.5.2 Vadose (Unsaturated) Zone Recharge
        • 3.5.3 Saturated Zone Recharge
        • 3.6 Subsurface Storage
        • 3.7 Recovery
        • 3.8 Post-treatment
        • 3.9 End Uses
        • 4 Planning
        • 4.1 Initial Project Scoping
        • 4.1.1 Define MAR Objectives
        • 4.1.2 Preliminary Conceptual Plan
        • 4.2 Initial Planning Activities
        • 4.2.1 Develop Evaluation Criteria
        • 4.2.2 Example Water Sources and Demand Criteria
        • Example Site Hydrogeology Criteria
        • 4.2.4 Example Environmental Criteria
        • 4.2.5 Example Implementation Criteria
        • 4.2.6 Example Regulatory Criteria
        • 4.2.7 Data Gathering for Criteria Evaluation
        • 4.3 Detailed Planning: Identify Final Potential MAR Project Sites
        • 4.3.1 Initial Project Site Screening
        • 4.3.2 Detailed Evaluation
        • 4.3.3 Selection of Sites for Feasibility Studies
        • 4.3.4 Public Participation
        • 4.3.5 Documentation
        • 5 Design and Testing
        • 5.1 Design Phases
        • 5.1.1 Conceptual Design
        • 5.1.2 Preliminary Design
        • 5.1.3 Final Design
        • 5.1.4 Computer Modeling for Design
        • 5.2 Design Considerations for Surface Facilities
        • 5.2.1 Hydrogeology
        • 5.2.2 Site Location, Size, Layout, and Operational Flexibility
        • 5.2.3 Basin Design
        • 5.2.4 Source Water
        • 5.2.5 Water Quality
        • 5.2.6 Pre- and Posttreatment in Sedimentation Basins
        • 5.2.7 Flow Structures
        • 5.2.8 Flow Measurement
        • 5.2.9 Maintenance
        • 5.2.10 Mound Management
        • 5.2.11 Groundwater Monitoring
        • 5.2.12 Regulatory and Water Rights
        • 5.3 Design Considerations for Subsurface Facilities
        • 5.3.1 Hydrogeology
        • 5.3.2 Well Field Layout
        • 5.3.3 Well Design
        • 5.3.4 Source Water
        • 5.3.5 Water Quality and Compatibility
        • 5.3.6 Water Treatment
        • 5.3.7 Well Pumps and Piping
        • 5.3.8 Corrosion Protection
        • 5.3.9 Flow Measurement
        • 5.3.10 Maintenance
        • 5.3.11 Mound Management
        • 5.3.12 Groundwater Monitoring
        • 5.3.13 Regulatory and Water Rights
        • 5.4 Pilot Testing
        • 5.5 Design Documents
        • 5.5.1 Preparation of Detailed Plans and Specifications
        • 5.5.2 MAR Project Operation and Maintenance Plan
        • 5.5.3 Periodic Review Schedule
        • 5.5.4 Project Life
        • 6 Construction, Monitoring, and Records

          6.1 Site Preparation

        • 6.2 Aquifer Connection for Surface Facilities
        • 6.2.1 Site Excavation and Grading
        • 6.2.2 Flow Structures and Piping
        • 6.2.3 Facility Start-Up and Testing
        • 6.3 Aquifer Connection for Subsurface Facilities
        • 6.3.1 Drilling
        • 6.3.2 Well Construction and Development
        • 6.3.3 Aquifer and Well Performance Testing
        • 6.3.4 Installation of Pump and Piping
        • 6.3.5 Facility Start-Up and Testing
        • 6.4 Electrical and SCADA System
        • 6.5 Water Treatment Facilities
        • 6.5.1 Common Water Treatment Issues
        • 6.5.2 Facility Startup and Testing
        • 6.6 Monitoring Equipment
        • 6.7 Construction Records
        • 7 Operations and Maintenance of MAR Facilities
        • 7.1 Start-Up and Training
        • 7.1.1 Start-Up for Surface Recharge Facilities
        • 7.1.2 Startup for Subsurface Recharge Facilities
        • 7.1.3 Operator Training
        • 7.2 Operations and Maintenance for Surface Facilities
        • 7.2.1 Operational Data and Analyses to Evaluate System Performance
        • 7.2.2 Issues Affecting Surface MAR Operations
        • 7.2.3 Clogging
        • 7.2.4 Shallow Groundwater Levels
        • 7.2.5 Undesirable Health Effects
        • 7.2.6 Facility Integrity
        • 7.2.7 Site Security
        • 7.3 Operations and Maintenance for Subsurface Facilities
        • 7.3.1 Operational Data and Analyses to Evaluate System Performance
        • 7.3.2 Issues Affecting Subsurface MAR Operations
        • 7.3.3 Clogging of Recharge Wells
        • 7.3.4 Clogging of a Vadose Zone Well
        • 7.3.5 Redevelopment of Recharge Wells
        • 7.3.6 Sand Production
        • 7.3.7 Site Security
        • 7.3.8 Well Shutdown
        • 7.4 Water Quality Monitoring and Treatment
        • 7.4.1 Monitoring
        • 7.4.2 Treatment
        • 8 Facility Closure
        • 8.1 Surface Infiltration Facilities
        • 8.2 Subsurface Facilities
        • 9 Data Collection and Analysis
        • 9.1 Data Collection
        • 9.2 Data Collection Phases
        • 9.2.1 Planning Phase
        • 9.2.1.1 Prefeasibility Planning Phase
        • 9.2.1.2 Feasibility Planning Phase
        • 9.2.2 Design Phase
        • 9.2.3 Construction Phase
        • 9.2.4 Operations Phase
        • 9.2.5 Closure Phase
        • 9.3 Data Organization and Management
        • 9.4 Data Needs for MAR Feasibility Studies
        • 9.4.1 Source Water
        • 9.4.2 Recharge Method
        • 9.4.3 Aquifer Storage Recovery
        • 9.4.4 Impacts
        • 9.5 Data Analysis
        • 9.5.1 Source Water Delivery Analysis
        • 9.5.2 Estimating Recharge and Recovery Volumes and Efficiency
        • 9.6 Modeling
        • 9.6.1 Mass Balance Models
        • 9.6.2 Numerical Models
        • 9.6.3 Data Collection for Modeling
        • 9.6.4 Determining Sensitive Variables
        • 9.6.5 Data Collection for Uncertainty Analysis
        • 9.6.6 Geochemical Modeling
        • 9.7 Monitoring and Compliance Data
        • 9.8 Operational Data Collection
        • 9.9 Data Collection to Evaluate Performance
        • 9.10 Reporting
        • Appendixes
        • Appendix A. Glossary of Groundwater Terms
        • Appendix B. Notations and Symbols
        • Appendix C. MAR Regulations in the United States
        • Appendix D. Case Studies
        • References
        • Index

          Recently viewed products

          © 2026 Book Curl

            • American Express
            • Apple Pay
            • Diners Club
            • Discover
            • Google Pay
            • Maestro
            • Mastercard
            • PayPal
            • Shop Pay
            • Union Pay
            • Visa

            Login

            Forgot your password?

            Don't have an account yet?
            Create account