Description

Book Synopsis

The main construction of HS2, Britain's high-speed rail network, began in September 2020. Phase One will see London to Birmingham linked by trains that can reach 225mph and Phase Two joins Birmingham with Manchester and Leeds. This is a 2 part book set combining V1 & V2 of High Speed Two (HS2) Infrastructure Design and Construction

High Speed Two HS2 Infrastructure Design and

Product form

£130.62

Includes FREE delivery

RRP £137.50 – you save £6.88 (5%)

Order before 4pm tomorrow for delivery by Thu 22 Jan 2026.

A Multiple-component retail product by High Speed Two

3 in stock


    View other formats and editions of High Speed Two HS2 Infrastructure Design and by High Speed Two

    Publisher: Emerald Publishing Limited
    Publication Date: 27/10/2021
    ISBN13: 9780727766373, 978-0727766373
    ISBN10: 0727766376

    Description

    Book Synopsis

    The main construction of HS2, Britain's high-speed rail network, began in September 2020. Phase One will see London to Birmingham linked by trains that can reach 225mph and Phase Two joins Birmingham with Manchester and Leeds. This is a 2 part book set combining V1 & V2 of High Speed Two (HS2) Infrastructure Design and Construction

    Recently viewed products

    © 2026 Book Curl

      • American Express
      • Apple Pay
      • Diners Club
      • Discover
      • Google Pay
      • Maestro
      • Mastercard
      • PayPal
      • Shop Pay
      • Union Pay
      • Visa

      Login

      Forgot your password?

      Don't have an account yet?
      Create account