Description

Book Synopsis

Guidance Note 2: Isolation & Switching provides clear guidance on what can be a confusing aspect of BS 7671. It is ideal for those working in specification, testing and inspection and for consulting engineers, as well as electrical installers and has been fully updated to BS 7671:2018:2022.

BS 7671:2018+A2:2022 incorporates changes from the first amendment, published in 2020, regarding Electric Vehicle Charging Installations to provide greater guidance on embracing changing technology within this sector. Additional changes within the second amendment include protection against thermal effects and fire caused by electrical equipment, protection against voltage disturbances and electromagnetic disturbances, and a new chapter on prosumer's low-voltage electrical installations covering energy efficiency measures, the interface with the smart grid, the management of electricity consumption, the management of renewable sources of electricity, and energy storage.



Table of Contents
  • Cooperating organizations
  • Acknowledgements
  • Preface
  • Introduction
  • Chapter 1: Statutory requirements
  • Chapter 2: Overview of the Wiring Regulations
  • Chapter 3: Definitions and principles
  • Chapter 4: Isolation
  • Chapter 5: Switching off for mechanical maintenance
  • Chapter 6: Emergency switching and emergency stopping
  • Chapter 7: Functional switching
  • Chapter 8: Firefighters' switches
  • Chapter 9: Special installations or locations
  • Chapter 10: Prosumer's low-voltage electrical installations
  • Appendix A: Safety service and product standards of relevance to this Guidance Note
  • Appendix B: Safe isolation procedures
  • Appendix C: Permit-to-Work procedures
  • Appendix D: Safety locks and group lock boxes
  • Appendix E: Forms of separation for LV switchgear
  • Index

Guidance Note 2: Isolation & Switching

Product form

£35.15

Includes FREE delivery

RRP £37.00 – you save £1.85 (5%)

Order before 4pm today for delivery by Fri 19 Dec 2025.

A Paperback / softback by The Institution of Engineering and Technology

7 in stock


    View other formats and editions of Guidance Note 2: Isolation & Switching by The Institution of Engineering and Technology

    Publisher: Institution of Engineering and Technology
    Publication Date: 18/07/2022
    ISBN13: 9781839532337, 978-1839532337
    ISBN10: 1839532335

    Description

    Book Synopsis

    Guidance Note 2: Isolation & Switching provides clear guidance on what can be a confusing aspect of BS 7671. It is ideal for those working in specification, testing and inspection and for consulting engineers, as well as electrical installers and has been fully updated to BS 7671:2018:2022.

    BS 7671:2018+A2:2022 incorporates changes from the first amendment, published in 2020, regarding Electric Vehicle Charging Installations to provide greater guidance on embracing changing technology within this sector. Additional changes within the second amendment include protection against thermal effects and fire caused by electrical equipment, protection against voltage disturbances and electromagnetic disturbances, and a new chapter on prosumer's low-voltage electrical installations covering energy efficiency measures, the interface with the smart grid, the management of electricity consumption, the management of renewable sources of electricity, and energy storage.



    Table of Contents
    • Cooperating organizations
    • Acknowledgements
    • Preface
    • Introduction
    • Chapter 1: Statutory requirements
    • Chapter 2: Overview of the Wiring Regulations
    • Chapter 3: Definitions and principles
    • Chapter 4: Isolation
    • Chapter 5: Switching off for mechanical maintenance
    • Chapter 6: Emergency switching and emergency stopping
    • Chapter 7: Functional switching
    • Chapter 8: Firefighters' switches
    • Chapter 9: Special installations or locations
    • Chapter 10: Prosumer's low-voltage electrical installations
    • Appendix A: Safety service and product standards of relevance to this Guidance Note
    • Appendix B: Safe isolation procedures
    • Appendix C: Permit-to-Work procedures
    • Appendix D: Safety locks and group lock boxes
    • Appendix E: Forms of separation for LV switchgear
    • Index

    Recently viewed products

    © 2025 Book Curl

      • American Express
      • Apple Pay
      • Diners Club
      • Discover
      • Google Pay
      • Maestro
      • Mastercard
      • PayPal
      • Shop Pay
      • Union Pay
      • Visa

      Login

      Forgot your password?

      Don't have an account yet?
      Create account