Description

Book Synopsis

Urban riverbanks are attractive locations and highly prized recreational environments. The designs of urban river landscapes must fulfill a broad range of requirements: flood control, open space design, and ecology are as a rule the three dominant themes, and they must often be reconciled within a very restricted space. The river must be understood as a process: governed by changing water levels, shifting seasons, erosion, and sedimentation, the river environment is not a static entity but constantly changing—the design must be flexible and take this into account.
This book is the product of a multi-year study that subjected more than fifty Western European projects to a comparative analysis. The result is a systematic catalog of effective strategies and innovative design elements. First, designers and planners are given an overview of the broad and varied spectrum of design possibilities. The book’s process-oriented approach is especially helpful where the focus is on long-term, sustainable measures. The publication consists of two linked volumes that enable the reader to consult the systematic catalog and the case study section side by side. The easy-to-navigate structure and an extensive glossary provide further guidance, while the work’s highly distinctive design makes it visually appealing as well and invites the reader to leaf through and explore it.



Table of Contents

((BAND 1))

Vorwort

1 GRUNDLAGEN (I)

Fluss.Raum.entwerfen: Zum Buch (II)

Ziele und Methodik (III)
Inhalte und Projektauswahl (III)

Buchstruktur und Leseanleitung (III)

Planungsvoraussetzungen für urbane Flussräume (II)

Multifunktionalität (III)

Interdisziplinarität (III)

Prozessorientierung (III)

Gewässerräume und ihre Prozesse (II)

Prozesse und ihre Antriebskräfte (III)

Prozesstypen (III)
Temporäre Abflussschwankungen (IV)

Teilprozess 1: Vertikale Wasserstandschwankungen (V)
Teilprozess 2: Horizontale Ausbreitung des Wassers (V)

Morphodynamische Prozesse (IV)

Teilprozess 1: Umlagerungsprozesse (V)
Teilprozess 2: Eigendynamische Laufentwicklung (V)

Gewässerlandschaften als Ausdruck raum-zeitlicher Prozesse (III)

Definition der Flussbegrenzungen (II)

Überflutungsgrenze (III)

Grenze der eigendynamischen Laufentwicklung (III)

Erosion und Sedimentation (III)

2 KATALOG DER MAßNAHMEN (I)

Einführung (II)

Prozessräume (III)

Entwurfsstrategien (III)

Gestaltungsmittel und -maßnahmen (III)

Prozessraum A: Ufermauern und Promenaden (II)

Freiraumnutzung (IV)
Ökologie (IV)

Hochwasserschutz (IV)

A1 Raum linear erweitern (III)

A1.1 Zwischenebenen (IV)

A1.2 Terrassen (IV)

A1.3 große Ufertreppen (IV)

A2 Raum punktuell erweitern (III)

A2.1 flussparallele Zugänge (IV)

A2.2 90-Grad-Zugänge (IV)

A3 temporŠr widerstehen (III)

A3.1 verschließbare Zugänge (IV)

A3.2 Sicht erhalten (IV)

A4 mitgehen (III) ((besser als mitbewegen))

A4.1 schwimmende Stege (IV)

A4.2 schwimmende Inseln (IV)

A4.3 Hausboot bis Badeschiff (IV) Schiffe ? ((unter Hausboot stellt man sich ja kein Café vor))

A5 darŸberstellen (III)

A5.1 Balkone (IV)

A 5.2 Überhang (IV)

A5.3 schwebende Wegeverbindungen (IV)

A6 tolerieren (III)

A 6.1 Unterwassertrittstufen (IV)

A 6.2 Stör- und Trittsteine (IV)

A 6.3 Vorufer (IV)

A6.4 überflutbare Uferwege (IV)

A6.5 überflutbare Stege (IV)

A6.6 Ufermauer überwinden (IV)

A6.7 überflutungstolerantes Mobiliar (IV)

A6.8 überflutungstolerante Bepflanzung (IV)

A6.9 neue Ufermauern (IV)

A7 wahrnehmbar machen (III)

A7.1 Wasserdynamik sichtbar machen (IV)

A7.2 Wasserstände markieren (IV)

A7.3 Kunstobjekte (IV)

Prozessraum B: Flutwände und Deiche

B1 Widerstand differenzieren (III)

B1.1 Deichpark (IV)

B1.2 Bäume auf Deichen (IV)

B1.3 Deichprofil modellieren (IV)

B1.4 Deiche als Wegeverbindungen (IV)

B1.5 Deichtreppen und –promenaden (IV)

B1.6 Superdeiche (IV)

B2 vertikal widerstehen (III)

B2.1 Hochwasserschutzmauern integrieren (IV)

B2.2 Mauerhöhen relativieren (IV)

B3 Widerstand verstŠrken (III)

B3.1 unsichtbar stabilisieren (IV)

B3.2 Glaswände (IV)

B3.3 Erhöhungen umgehen (IV)

B4 Widerstand integrieren (III)

B4.1 Nutzung der historischen Stadtmauer (IV)

B4.2 wasserdichte Fassaden (IV)

B4.3 bestehende Dämme umnutzen (IV)

B5 temporŠr widerstehen (III)

B5.1 freie Elemente (IV)

B5.2 aufsetzbare Elemente (IV)

B5.3 aufklappbare Elemente (IV)

B6 Wasserschwankungen inszenieren (III)

B6.1 sichtbare Hochwasserschutzelemente (IV)

B6.2 Vergleichspunkte schaffen (IV)

B6.3 Glaswände (IV)

Prozessraum C: Überflutungsflächen (II)

C1 Raum erweitern (III)

C1.1 Deichrückverlegung (IV)

C1.2 Bypass (IV)

C1.3 Flutmulde (IV)

C1.4 Vorland abgraben (IV)

C1.5 stehende Gewässer im Vorland (IV)

C1.6 Poldersystem (IV)

C1.7 Rückhaltebecken mit Kammerung (IV)

C2 tolerieren (III)

C2.1 Wegeführung in der Aue (IV)

C2.2 Sport- und Spielanlagen (IV)

C2.3 hochwasserfeste Gebäude (IV)

C2.4 Park in der Aue (IV)

C2.5 Großräumige Naturgebiete (IV)

C2.6 Landwirtschaft (IV)

C2.7 Zelt- und Campingplätze (IV)

C2.8 Veranstaltungsgelände (IV)

C3 ausweichen (III)

C3.1 Vorhersagen und Absperrungen (IV)

C3.2 Warnschilder und Gestaltung (IV)

C3.3 elektronische Warnsysteme (IV)

C4 darüberstellen (III)

C4.1 Warften (IV)

C4.2 Warftprinzip in Gebäuden (IV)

C4.3 Fluchthügel (IV)

C4.4 Pfahlbauten (IV)

C4.5 Sommerdeiche (IV)

C4.6 Fluchtstege (IV)

C4.7 Seilbahn (IV)

C5 mitgehen (III)

C5.1 schwimmende und amphibische Wohnformen (IV)

C5.2 Yachthäfen (IV)

Prozessraum D: Flussbette und Fließräume

D 1 Stršmung lenken (III)

D1.1 Stör- und Trittsteine (IV)

D1.2 Totholz (IV)

D1.3 gesetzte Steinbuhnen (IV)

D1.4 geschüttete Steinbuhnen (IV)

D1.5 Lebendbauweise (IV)

D1.6 überströmte Buhnen (IV)

D1.7 Querriegel (IV)

D2 GewŠsserlauf differenzieren (III)

D2.1 aufweiten (IV)

D2.2 Lauf verlängern (IV)

D2.3 Ufer abflachen (IV)

D3 Morphodynamik initiieren (III)

D3.1 Anlandung durch Strömungsberuhigung (IV)

D3.2 Kolkbildung durch Strömungslenkung (IV)

D3.3 Anlandung in Buchten (IV)

D4 Ufersicherung differenzieren (III)

D4.1 Ufer teilweise entsichern (IV)

D4.2 Lebendverbau (IV)

D4.3 Steinverbau (IV)

D4.4 Sicherung durch Strömungslenkung (IV)

D4.5 Stufen und Treppen (IV)

D4.6 Wege und Terrassen am Wasser (IV)

D4.7 Balkone (IV)

D5 Sohlsicherung differenzieren (III)

D5.1 Fischaufstiegshilfen (IV)

D5.2 Sohl- und Querbauwerke umgestalten (IV)

D5.3 Rampen und Gleiten (IV)

Prozessraum E: Dynamisierte Flusslandschaften (II)

E1 Entwicklungsgrenzen auflšsen (III)

E1.1 Ufersicherung entfernen (IV)

E1.2 Gewässerunterhaltung anpassen (IV)

E 2 Laufentwicklung initiieren (III)

E2.1 Ufer abflachen (IV)

E2.2 Profil differenzieren (IV)

E2.3 Störelemente einbringen (IV)

E2.4 Geschiebehaushalt optimieren (IV)

E2.5 Wasserhaushalt optimieren (IV)

E3 neuen GewŠsserlauf gestalten (III)

E3.1 mäandrierenden Gewässerlauf vorgeben (IV)

E3.2 begradigten Lauf einbeziehen (IV)

E3.3 Gewässerverzweigung anlegen (IV)

E 4 Laufentwicklung begrenzen (III)

E4.1 „schlafende" Ufersicherung (IV)

E4.2 virtuelle Grenze (IV)

E4.3 punktuelle Sicherungen integrieren (IV)

E5 Prozesse wahrnehmbar machen (III)

E5.1 Inszenierung der alten Gewässerstrukturen (IV)

E5.2 Inszenierung neuer Elemente (IV)

E5.3 eigendynamische Prozesse erleben (IV)

((BAND 2))

3 PROJEKTBEISPIELE (I)

Einführung (II)

Übersichtskarte (III)

Prozessraum A: Städtische Ufer und Promenaden (II)
Elster- und Pleißemühlgraben, Leipzig

Leine, Hannover

Limmat, Zürich (Fabrik am Wasser)

Limmat, Zürich (Wipkinger Park)

Spree, Berlin
Rhone, Lyon

Seine, Choisy le Roi

Wupper, Wuppertal

Prozessraum B: Flutwände und Deiche (II)

Main, Miltenberg

Main, Wörth

Nahe, Bad Kreuznach

Ebro, Zaragoza (Parque del agua)

IJssel, Doesburg

Ijssel, Kampen

Waal, Afferden-Dremel

Waal, Zaltbommel

Prozessraum C: Überflutungsflächen (II)

Bergsche Maas, Waalwijk en Gertudenberg

Besòs, Barcelona

Gallego, Zuera

IJssel, Zwolle

Maas, Maasbommel

Petite Gironde, Le Mans

Rhein, Brühl

Rhein, Mannheim

Seine, Le Pecq

Waal, Gameren

Wupper, Solingen

Prozessraum D: Flussbette und Fließräume (II)

Ahna, Kassel

Alb, Karlsruhe

Birs, Basel

Kandelbach, Ladenburg

Leutschenbach, Zürich
Seille, Metz

Soestbach, Soest

Wiese, Basel

Wiese, Lörrach

Prozessraum E: Dynamisierte Flusslandschaften (II)

Emscher, Ellinghausen und Mengede

Isar, München

Losse, Kassel

Schunter, Braunschweig

Wahlebach Kassel

Werse, Beckum

ANHANG
Glossar
Quellen und weiterführende Literatur
Übersichtslisten
Register

Fluss.Raum.Entwerfen: Planungsstrategien für

    Product form

    £32.78

    Includes FREE delivery

    RRP £34.50 – you save £1.72 (4%)

    Order before 4pm today for delivery by Fri 24 Jul 2026.

    A Hardback by Martin Prominski, Antje Stokman, Daniel Stimberg

    1 in stock

      Trusted by thousands of customers. See 2,385+ Customer Reviews

      View other formats and editions of Fluss.Raum.Entwerfen: Planungsstrategien für by Martin Prominski

      Publisher: Birkhauser
      Publication Date: Publication Date: 14/09/2012
      ISBN13: 9783034606868, 978-3034606868
      ISBN10: 3034606869

      Description

      Book Synopsis

      Urban riverbanks are attractive locations and highly prized recreational environments. The designs of urban river landscapes must fulfill a broad range of requirements: flood control, open space design, and ecology are as a rule the three dominant themes, and they must often be reconciled within a very restricted space. The river must be understood as a process: governed by changing water levels, shifting seasons, erosion, and sedimentation, the river environment is not a static entity but constantly changing—the design must be flexible and take this into account.
      This book is the product of a multi-year study that subjected more than fifty Western European projects to a comparative analysis. The result is a systematic catalog of effective strategies and innovative design elements. First, designers and planners are given an overview of the broad and varied spectrum of design possibilities. The book’s process-oriented approach is especially helpful where the focus is on long-term, sustainable measures. The publication consists of two linked volumes that enable the reader to consult the systematic catalog and the case study section side by side. The easy-to-navigate structure and an extensive glossary provide further guidance, while the work’s highly distinctive design makes it visually appealing as well and invites the reader to leaf through and explore it.



      Table of Contents

      ((BAND 1))

      Vorwort

      1 GRUNDLAGEN (I)

      Fluss.Raum.entwerfen: Zum Buch (II)

      Ziele und Methodik (III)
      Inhalte und Projektauswahl (III)

      Buchstruktur und Leseanleitung (III)

      Planungsvoraussetzungen für urbane Flussräume (II)

      Multifunktionalität (III)

      Interdisziplinarität (III)

      Prozessorientierung (III)

      Gewässerräume und ihre Prozesse (II)

      Prozesse und ihre Antriebskräfte (III)

      Prozesstypen (III)
      Temporäre Abflussschwankungen (IV)

      Teilprozess 1: Vertikale Wasserstandschwankungen (V)
      Teilprozess 2: Horizontale Ausbreitung des Wassers (V)

      Morphodynamische Prozesse (IV)

      Teilprozess 1: Umlagerungsprozesse (V)
      Teilprozess 2: Eigendynamische Laufentwicklung (V)

      Gewässerlandschaften als Ausdruck raum-zeitlicher Prozesse (III)

      Definition der Flussbegrenzungen (II)

      Überflutungsgrenze (III)

      Grenze der eigendynamischen Laufentwicklung (III)

      Erosion und Sedimentation (III)

      2 KATALOG DER MAßNAHMEN (I)

      Einführung (II)

      Prozessräume (III)

      Entwurfsstrategien (III)

      Gestaltungsmittel und -maßnahmen (III)

      Prozessraum A: Ufermauern und Promenaden (II)

      Freiraumnutzung (IV)
      Ökologie (IV)

      Hochwasserschutz (IV)

      A1 Raum linear erweitern (III)

      A1.1 Zwischenebenen (IV)

      A1.2 Terrassen (IV)

      A1.3 große Ufertreppen (IV)

      A2 Raum punktuell erweitern (III)

      A2.1 flussparallele Zugänge (IV)

      A2.2 90-Grad-Zugänge (IV)

      A3 temporŠr widerstehen (III)

      A3.1 verschließbare Zugänge (IV)

      A3.2 Sicht erhalten (IV)

      A4 mitgehen (III) ((besser als mitbewegen))

      A4.1 schwimmende Stege (IV)

      A4.2 schwimmende Inseln (IV)

      A4.3 Hausboot bis Badeschiff (IV) Schiffe ? ((unter Hausboot stellt man sich ja kein Café vor))

      A5 darŸberstellen (III)

      A5.1 Balkone (IV)

      A 5.2 Überhang (IV)

      A5.3 schwebende Wegeverbindungen (IV)

      A6 tolerieren (III)

      A 6.1 Unterwassertrittstufen (IV)

      A 6.2 Stör- und Trittsteine (IV)

      A 6.3 Vorufer (IV)

      A6.4 überflutbare Uferwege (IV)

      A6.5 überflutbare Stege (IV)

      A6.6 Ufermauer überwinden (IV)

      A6.7 überflutungstolerantes Mobiliar (IV)

      A6.8 überflutungstolerante Bepflanzung (IV)

      A6.9 neue Ufermauern (IV)

      A7 wahrnehmbar machen (III)

      A7.1 Wasserdynamik sichtbar machen (IV)

      A7.2 Wasserstände markieren (IV)

      A7.3 Kunstobjekte (IV)

      Prozessraum B: Flutwände und Deiche

      B1 Widerstand differenzieren (III)

      B1.1 Deichpark (IV)

      B1.2 Bäume auf Deichen (IV)

      B1.3 Deichprofil modellieren (IV)

      B1.4 Deiche als Wegeverbindungen (IV)

      B1.5 Deichtreppen und –promenaden (IV)

      B1.6 Superdeiche (IV)

      B2 vertikal widerstehen (III)

      B2.1 Hochwasserschutzmauern integrieren (IV)

      B2.2 Mauerhöhen relativieren (IV)

      B3 Widerstand verstŠrken (III)

      B3.1 unsichtbar stabilisieren (IV)

      B3.2 Glaswände (IV)

      B3.3 Erhöhungen umgehen (IV)

      B4 Widerstand integrieren (III)

      B4.1 Nutzung der historischen Stadtmauer (IV)

      B4.2 wasserdichte Fassaden (IV)

      B4.3 bestehende Dämme umnutzen (IV)

      B5 temporŠr widerstehen (III)

      B5.1 freie Elemente (IV)

      B5.2 aufsetzbare Elemente (IV)

      B5.3 aufklappbare Elemente (IV)

      B6 Wasserschwankungen inszenieren (III)

      B6.1 sichtbare Hochwasserschutzelemente (IV)

      B6.2 Vergleichspunkte schaffen (IV)

      B6.3 Glaswände (IV)

      Prozessraum C: Überflutungsflächen (II)

      C1 Raum erweitern (III)

      C1.1 Deichrückverlegung (IV)

      C1.2 Bypass (IV)

      C1.3 Flutmulde (IV)

      C1.4 Vorland abgraben (IV)

      C1.5 stehende Gewässer im Vorland (IV)

      C1.6 Poldersystem (IV)

      C1.7 Rückhaltebecken mit Kammerung (IV)

      C2 tolerieren (III)

      C2.1 Wegeführung in der Aue (IV)

      C2.2 Sport- und Spielanlagen (IV)

      C2.3 hochwasserfeste Gebäude (IV)

      C2.4 Park in der Aue (IV)

      C2.5 Großräumige Naturgebiete (IV)

      C2.6 Landwirtschaft (IV)

      C2.7 Zelt- und Campingplätze (IV)

      C2.8 Veranstaltungsgelände (IV)

      C3 ausweichen (III)

      C3.1 Vorhersagen und Absperrungen (IV)

      C3.2 Warnschilder und Gestaltung (IV)

      C3.3 elektronische Warnsysteme (IV)

      C4 darüberstellen (III)

      C4.1 Warften (IV)

      C4.2 Warftprinzip in Gebäuden (IV)

      C4.3 Fluchthügel (IV)

      C4.4 Pfahlbauten (IV)

      C4.5 Sommerdeiche (IV)

      C4.6 Fluchtstege (IV)

      C4.7 Seilbahn (IV)

      C5 mitgehen (III)

      C5.1 schwimmende und amphibische Wohnformen (IV)

      C5.2 Yachthäfen (IV)

      Prozessraum D: Flussbette und Fließräume

      D 1 Stršmung lenken (III)

      D1.1 Stör- und Trittsteine (IV)

      D1.2 Totholz (IV)

      D1.3 gesetzte Steinbuhnen (IV)

      D1.4 geschüttete Steinbuhnen (IV)

      D1.5 Lebendbauweise (IV)

      D1.6 überströmte Buhnen (IV)

      D1.7 Querriegel (IV)

      D2 GewŠsserlauf differenzieren (III)

      D2.1 aufweiten (IV)

      D2.2 Lauf verlängern (IV)

      D2.3 Ufer abflachen (IV)

      D3 Morphodynamik initiieren (III)

      D3.1 Anlandung durch Strömungsberuhigung (IV)

      D3.2 Kolkbildung durch Strömungslenkung (IV)

      D3.3 Anlandung in Buchten (IV)

      D4 Ufersicherung differenzieren (III)

      D4.1 Ufer teilweise entsichern (IV)

      D4.2 Lebendverbau (IV)

      D4.3 Steinverbau (IV)

      D4.4 Sicherung durch Strömungslenkung (IV)

      D4.5 Stufen und Treppen (IV)

      D4.6 Wege und Terrassen am Wasser (IV)

      D4.7 Balkone (IV)

      D5 Sohlsicherung differenzieren (III)

      D5.1 Fischaufstiegshilfen (IV)

      D5.2 Sohl- und Querbauwerke umgestalten (IV)

      D5.3 Rampen und Gleiten (IV)

      Prozessraum E: Dynamisierte Flusslandschaften (II)

      E1 Entwicklungsgrenzen auflšsen (III)

      E1.1 Ufersicherung entfernen (IV)

      E1.2 Gewässerunterhaltung anpassen (IV)

      E 2 Laufentwicklung initiieren (III)

      E2.1 Ufer abflachen (IV)

      E2.2 Profil differenzieren (IV)

      E2.3 Störelemente einbringen (IV)

      E2.4 Geschiebehaushalt optimieren (IV)

      E2.5 Wasserhaushalt optimieren (IV)

      E3 neuen GewŠsserlauf gestalten (III)

      E3.1 mäandrierenden Gewässerlauf vorgeben (IV)

      E3.2 begradigten Lauf einbeziehen (IV)

      E3.3 Gewässerverzweigung anlegen (IV)

      E 4 Laufentwicklung begrenzen (III)

      E4.1 „schlafende" Ufersicherung (IV)

      E4.2 virtuelle Grenze (IV)

      E4.3 punktuelle Sicherungen integrieren (IV)

      E5 Prozesse wahrnehmbar machen (III)

      E5.1 Inszenierung der alten Gewässerstrukturen (IV)

      E5.2 Inszenierung neuer Elemente (IV)

      E5.3 eigendynamische Prozesse erleben (IV)

      ((BAND 2))

      3 PROJEKTBEISPIELE (I)

      Einführung (II)

      Übersichtskarte (III)

      Prozessraum A: Städtische Ufer und Promenaden (II)
      Elster- und Pleißemühlgraben, Leipzig

      Leine, Hannover

      Limmat, Zürich (Fabrik am Wasser)

      Limmat, Zürich (Wipkinger Park)

      Spree, Berlin
      Rhone, Lyon

      Seine, Choisy le Roi

      Wupper, Wuppertal

      Prozessraum B: Flutwände und Deiche (II)

      Main, Miltenberg

      Main, Wörth

      Nahe, Bad Kreuznach

      Ebro, Zaragoza (Parque del agua)

      IJssel, Doesburg

      Ijssel, Kampen

      Waal, Afferden-Dremel

      Waal, Zaltbommel

      Prozessraum C: Überflutungsflächen (II)

      Bergsche Maas, Waalwijk en Gertudenberg

      Besòs, Barcelona

      Gallego, Zuera

      IJssel, Zwolle

      Maas, Maasbommel

      Petite Gironde, Le Mans

      Rhein, Brühl

      Rhein, Mannheim

      Seine, Le Pecq

      Waal, Gameren

      Wupper, Solingen

      Prozessraum D: Flussbette und Fließräume (II)

      Ahna, Kassel

      Alb, Karlsruhe

      Birs, Basel

      Kandelbach, Ladenburg

      Leutschenbach, Zürich
      Seille, Metz

      Soestbach, Soest

      Wiese, Basel

      Wiese, Lörrach

      Prozessraum E: Dynamisierte Flusslandschaften (II)

      Emscher, Ellinghausen und Mengede

      Isar, München

      Losse, Kassel

      Schunter, Braunschweig

      Wahlebach Kassel

      Werse, Beckum

      ANHANG
      Glossar
      Quellen und weiterführende Literatur
      Übersichtslisten
      Register

      Recently viewed products

      © 2026 Book Curl

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account