Description

Book Synopsis
In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 ‘‘Orange Book’’). These conditions, known as the ‘‘FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employer’s Representative as one of the parties.

Trade Review
From the reviews: “Book is written by an engineer and a lawyer. … The Jaeger / Hok work does refer to awards. … provides wide-ranging references not only to decisions of UK courts but also to sources in other jurisdictions. It therefore provides a real service in alerting readers to the need to bear in mind when specialist legal advice may be needed. … useful flow charts to assist the understanding of the operation of the FIDIC forms. … work provides rather more general guidance on legal aspects.” (Humphrey Lloyd, The International Construction Law Review, 2010)

Table of Contents
Legal Systems.- Conflict of Laws.- English and International Standard Forms of Contract.- Civil Law Business Terms.- Development Stages.- Understanding FIDIC: A Civil Law Approach.- FIDIC Contract Documents.- Employer’s Duties.- Contractor’s Duties.- Design Responsibility.- Engineer.- Time for Completion.- Variations.- Tests.- Certificates.- Defects Notification Period and (Post Contractual) Defects Liability.- Termination.- Discharge, Frustration and Force Majeure.- Risk, Insurance and Exceptional Risk.- Bonds, Guarantees, Letters of Credit.- Claim Management.- Disputes.- Samples.- Delay Schedule.

FIDIC - A Guide for Practitioners

    Product form

    £132.99

    Includes FREE delivery

    RRP £139.99 – you save £7.00 (5%)

    Order before 4pm tomorrow for delivery by Tue 16 Jun 2026.

    A Hardback by Axel-Volkmar Jaeger, Götz-Sebastian Hök

    15 in stock


      View other formats and editions of FIDIC - A Guide for Practitioners by Axel-Volkmar Jaeger

      Publisher: Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
      Publication Date: 07/12/2009
      ISBN13: 9783642020995, 978-3642020995
      ISBN10: 3642020992

      Description

      Book Synopsis
      In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 ‘‘Orange Book’’). These conditions, known as the ‘‘FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employer’s Representative as one of the parties.

      Trade Review
      From the reviews: “Book is written by an engineer and a lawyer. … The Jaeger / Hok work does refer to awards. … provides wide-ranging references not only to decisions of UK courts but also to sources in other jurisdictions. It therefore provides a real service in alerting readers to the need to bear in mind when specialist legal advice may be needed. … useful flow charts to assist the understanding of the operation of the FIDIC forms. … work provides rather more general guidance on legal aspects.” (Humphrey Lloyd, The International Construction Law Review, 2010)

      Table of Contents
      Legal Systems.- Conflict of Laws.- English and International Standard Forms of Contract.- Civil Law Business Terms.- Development Stages.- Understanding FIDIC: A Civil Law Approach.- FIDIC Contract Documents.- Employer’s Duties.- Contractor’s Duties.- Design Responsibility.- Engineer.- Time for Completion.- Variations.- Tests.- Certificates.- Defects Notification Period and (Post Contractual) Defects Liability.- Termination.- Discharge, Frustration and Force Majeure.- Risk, Insurance and Exceptional Risk.- Bonds, Guarantees, Letters of Credit.- Claim Management.- Disputes.- Samples.- Delay Schedule.

      Recently viewed products

      © 2026 Book Curl

        • American Express
        • Apple Pay
        • Diners Club
        • Discover
        • Google Pay
        • Maestro
        • Mastercard
        • PayPal
        • Shop Pay
        • Union Pay
        • Visa

        Login

        Forgot your password?

        Don't have an account yet?
        Create account