{"product_id":"guidelines-for-safe-and-reliable-instrumented-protective-systems-9780471979401","title":"Guidelines for Safe and Reliable Instrumented Protective Systems","description":"\u003cb\u003eBook Synopsis\u003c\/b\u003e\u003cbr\u003eThis book is a   how-to   guide that establishes a framework for designing and running safe and reliable process engineering systems. It clarifies the essential role of process engineers, plant operators, and facility managers who are responsible for the safe and reliable design of these instrumented systems.\u003cbr\u003e\u003cbr\u003e\u003cb\u003eTable of Contents\u003c\/b\u003e\u003cbr\u003eAcknowledgements.  \u003cp\u003ePreface.\u003c\/p\u003e \u003cp\u003eList of Figures.\u003c\/p\u003e \u003cp\u003eList of Tables.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eINTRODUCTION.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e1.1 Purpose.\u003c\/p\u003e \u003cp\u003e1.2 Target Audience.\u003c\/p\u003e \u003cp\u003e Book Road Map.\u003c\/p\u003e \u003cp\u003e1.4 Management Commitment.\u003c\/p\u003e \u003cp\u003e\u003cb\u003ePLANNING.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e2.1 Protective Management System Lifecycle.\u003c\/p\u003e \u003cp\u003e2.2 Why It Makes Good Business Sense.\u003c\/p\u003e \u003cp\u003e2.3 Documentation.\u003c\/p\u003e \u003cp\u003e2.4 Good Engineering Practices.\u003c\/p\u003e \u003cp\u003e2.5 Key Management System Elements.\u003c\/p\u003e \u003cp\u003e2.6 Special Topics.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eRISK ASSESSMENT.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e3.1 Intended Audience.\u003c\/p\u003e \u003cp\u003e3.2 Input Information.\u003c\/p\u003e \u003cp\u003e3.3 Basic Work Process.\u003c\/p\u003e \u003cp\u003e3.4 Output Documentation.\u003c\/p\u003e \u003cp\u003e3.5 Key Management System Elements.\u003c\/p\u003e \u003cp\u003e3.6 Special Topics.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eDESIGN.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e4.1 Intended Audience.\u003c\/p\u003e \u003cp\u003e4.2 Input Information.\u003c\/p\u003e \u003cp\u003e4.3 Basic Work Process.\u003c\/p\u003e \u003cp\u003e4.4 Output Documentation.\u003c\/p\u003e \u003cp\u003e4.5 Process Requirements.\u003c\/p\u003e \u003cp\u003e4.6 I\u0026amp;E Requirements.\u003c\/p\u003e \u003cp\u003e4.7 Functional Assessment.\u003c\/p\u003e \u003cp\u003e4.8 Key Management System Elements.\u003c\/p\u003e \u003cp\u003e4.9 Special Topics.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eENGINEERING, INSTALLATION, COMMISSIONING AND VALIDATION.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e5.1 Intended Audience.\u003c\/p\u003e \u003cp\u003e5.2 Input Information.\u003c\/p\u003e \u003cp\u003e5.3 Basic Work Projects.\u003c\/p\u003e \u003cp\u003e5.4 Output Documentation.\u003c\/p\u003e \u003cp\u003e5.5 Hardware.\u003c\/p\u003e \u003cp\u003e5.6 Software.\u003c\/p\u003e \u003cp\u003e5.7 Factory Acceptance Test.\u003c\/p\u003e \u003cp\u003e5.8 Installation Plans.\u003c\/p\u003e \u003cp\u003e5.9 Commissioning Plans.\u003c\/p\u003e \u003cp\u003e5.10 Verify Operator and External Interfaces.\u003c\/p\u003e \u003cp\u003e5.11 Validation.\u003c\/p\u003e \u003cp\u003e5.12 Management of Change.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eOPERATIONAL AND MECHANICAL INTEGRITY.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e6.1 Intended Audience.\u003c\/p\u003e \u003cp\u003e6.2 Input Information.\u003c\/p\u003e \u003cp\u003e6.3 Basic Work Process.\u003c\/p\u003e \u003cp\u003e6.4 Output Documentation.\u003c\/p\u003e \u003cp\u003e6.5 Operating Procedures.\u003c\/p\u003e \u003cp\u003e6.6 Bypass management Procedure.\u003c\/p\u003e \u003cp\u003e6.7 Maintenance Procedures.\u003c\/p\u003e \u003cp\u003e6.8 Training.\u003c\/p\u003e \u003cp\u003e6.9 Managing Changes.\u003c\/p\u003e \u003cp\u003e6.10 Monitoring performance.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCONTINOUS IMPROVEMENT.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e7.1 Intended Audience.\u003c\/p\u003e \u003cp\u003e7.2 Input Information.\u003c\/p\u003e \u003cp\u003e7.3 Basic Work Process.\u003c\/p\u003e \u003cp\u003e7.4 Output Documentation.\u003c\/p\u003e \u003cp\u003e7.5 Determining Path Forward.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eDEFINITIONS.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e\u003cb\u003ePROTECTION LAYERS.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003eB.1 Inherently Safer Design.\u003c\/p\u003e \u003cp\u003eB.2 Control.\u003c\/p\u003e \u003cp\u003eB.3 Supervisory.\u003c\/p\u003e \u003cp\u003eB.4 Preventive.\u003c\/p\u003e \u003cp\u003eB.5 Mitigative.\u003c\/p\u003e \u003cp\u003eB.6 Barriers.\u003c\/p\u003e \u003cp\u003eB.7 Limitation.\u003c\/p\u003e \u003cp\u003eB.8 Response.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCORE ATTRIBUTES.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003eC.1 Independence.\u003c\/p\u003e \u003cp\u003eC.2 Functionality.\u003c\/p\u003e \u003cp\u003eC.3 Integrity.\u003c\/p\u003e \u003cp\u003eC.4 Reliability.\u003c\/p\u003e \u003cp\u003eC.5 Auditability.\u003c\/p\u003e \u003cp\u003eC.6 Access Security.\u003c\/p\u003e \u003cp\u003eC.7 Management of Change.\u003c\/p\u003e \u003cp\u003e\u003cb\u003eUNDERSTANDING FAILURE.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003eD.1 Caution-It's A Benchmark.\u003c\/p\u003e \u003cp\u003eD.2 A \"Bathtub\"; Viewpoint.\u003c\/p\u003e \u003cp\u003eD.3 Failure Types.\u003c\/p\u003e \u003cp\u003eD.4 Failure Classification.\u003c\/p\u003e \u003cp\u003eD.5 IPF Performance metrics.\u003c\/p\u003e \u003cp\u003eD.6 Spurious Trip Rate.\u003c\/p\u003e \u003cp\u003eD.7 Example Application.\u003c\/p\u003e \u003cp\u003e\u003cb\u003ePROCESS EQUIPMENT RELIABILITY DATABASE.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e\u003cb\u003eUSER APPROVED EQUIPMENT AND PRACTICES.\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003eF.1 User Approved.\u003c\/p\u003e \u003cp\u003eF.2 Evolution of Plant Automation.\u003c\/p\u003e \u003cp\u003eF.3 Logic Solver Considerations.\u003c\/p\u003e \u003cp\u003eF.4 Field Device Considerations.\u003c\/p\u003e \u003cp\u003eF.5 Utilities.\u003c\/p\u003e \u003cp\u003eF.6 Wiring Practices.\u003c\/p\u003e \u003cp\u003eF.7 Communications and Interconnectivity.\u003c\/p\u003e \u003cp\u003eF.8 Prescriptive Design.\u003c\/p\u003e \u003cp\u003eReferences.\u003c\/p\u003e \u003cp\u003eAcronyms and Abbreviations.\u003c\/p\u003e \u003cp\u003eIndex.\u003c\/p\u003e","brand":"John Wiley \u0026 Sons Inc","offers":[{"title":"Default Title","offer_id":53515434590551,"sku":"9780471979401","price":143.06,"currency_code":"GBP","in_stock":true}],"url":"https:\/\/bookcurl.com\/products\/guidelines-for-safe-and-reliable-instrumented-protective-systems-9780471979401","provider":"Book Curl","version":"1.0","type":"link"}