{"product_id":"case-studies-in-mechanical-engineering-9781119119746","title":"Case Studies in Mechanical Engineering","description":"\u003cb\u003eBook Synopsis\u003c\/b\u003e\u003cbr\u003e\u003cp\u003e\u003cb\u003eUsing a case study approach, this reference tests the reader's ability to apply engineering fundamentals to real-world examples and receive constructive feedback\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e\u003ci\u003eCase Studies in Mechanical Engineering\u003c\/i\u003e provides real life examples of the application of engineering fundamentals. They relate to real equipment, real people and real decisions. They influence careers, projects, companies, and governments. The cases serve as supplements to fundamental courses in thermodynamics, fluid mechanics, heat transfer, instrumentation, economics, and statistics. The author explains equipment and concepts to solve the problems and suggests relevant assignments to augment the cases.\u003c\/p\u003e \u003cp\u003eGraduate engineers seeking to refresh their career, or acquire continuing education will find the studies challenging and rewarding. Each case is designed to be accomplished in one week, earning up to 15 hours of continuing education credit. Each case study provides methods to present an argument\u003cbr\u003e\u003cbr\u003e\u003cb\u003eTable of Contents\u003c\/b\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003eForeword xiii\u003c\/p\u003e \u003cp\u003ePreface xiv\u003c\/p\u003e \u003cp\u003eIntroduction xvi\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 1 Steam Turbine Performance Degradation 1\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e1.1 Steam Turbine Types 2\u003c\/p\u003e \u003cp\u003e1.1.1 Steam Turbine Components 5\u003c\/p\u003e \u003cp\u003e1.1.2 Startup and Operation 7\u003c\/p\u003e \u003cp\u003e1.1.3 Performance Monitoring and Analysis 10\u003c\/p\u003e \u003cp\u003e1.1.4 Analyzing Performance Data – Corrected Pressures 10\u003c\/p\u003e \u003cp\u003e1.1.5 Analyzing Performance Data – Flow Function 12\u003c\/p\u003e \u003cp\u003e1.2 Refresher 14\u003c\/p\u003e \u003cp\u003e1.2.1 Steam Turbine Efficiency 14\u003c\/p\u003e \u003cp\u003e1.2.2 Example 14\u003c\/p\u003e \u003cp\u003e1.3 Case Study Details 15\u003c\/p\u003e \u003cp\u003e1.3.1 Performance Trend 15\u003c\/p\u003e \u003cp\u003e1.3.2 IP Turbine Enthalpy Drop 16\u003c\/p\u003e \u003cp\u003e1.4 Case Study Findings 17\u003c\/p\u003e \u003cp\u003e1.5 Decision Making and Actions 18\u003c\/p\u003e \u003cp\u003e1.5.1 Value 18\u003c\/p\u003e \u003cp\u003e1.5.2 Decision Making and Actions – Alternatives 19\u003c\/p\u003e \u003cp\u003e1.5.3 Decision Making and Actions – Making a Plan 20\u003c\/p\u003e \u003cp\u003e1.6 Closure 20\u003c\/p\u003e \u003cp\u003e1.7 Symbols and Abbreviations 21\u003c\/p\u003e \u003cp\u003e1.8 Answer Key 21\u003c\/p\u003e \u003cp\u003eReferences 24\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 2 Risk \/ Reward Evaluation 26\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e2.1 Case Study 28\u003c\/p\u003e \u003cp\u003e2.2 Background 29\u003c\/p\u003e \u003cp\u003e2.2.1 Types of Gas Turbine Generating Plants 29\u003c\/p\u003e \u003cp\u003e2.3 Gas Turbine Operating Risks 33\u003c\/p\u003e \u003cp\u003e2.3.1 Gas Turbine Major Maintenance 35\u003c\/p\u003e \u003cp\u003e2.3.2 Equivalent Fired Hours 36\u003c\/p\u003e \u003cp\u003e2.3.3 Failure Costs 37\u003c\/p\u003e \u003cp\u003e2.3.4 Reading Assignment 37\u003c\/p\u003e \u003cp\u003e2.4 Case Study Evaluations 38\u003c\/p\u003e \u003cp\u003e2.4.1 Review 38\u003c\/p\u003e \u003cp\u003e2.4.2 Presenting Results 39\u003c\/p\u003e \u003cp\u003e2.4.3 Judgment Calls 40\u003c\/p\u003e \u003cp\u003e2.4.4 Exercise 40\u003c\/p\u003e \u003cp\u003e2.4.5 Sensitivities 41\u003c\/p\u003e \u003cp\u003e2.4.6 Exercise – Sensitivities 41\u003c\/p\u003e \u003cp\u003e2.4.7 Presentation of Results 41\u003c\/p\u003e \u003cp\u003e2.5 Case Study Results 42\u003c\/p\u003e \u003cp\u003e2.6 Closure 42\u003c\/p\u003e \u003cp\u003e2.7 Answer Key 43\u003c\/p\u003e \u003cp\u003eReference 45\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 3 Gas Turbine Compressor Fouling 46\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e3.1 Background 47\u003c\/p\u003e \u003cp\u003e3.1.1 Gas Turbine Types 47\u003c\/p\u003e \u003cp\u003e3.1.2 Gas Compressor Fouling and Cleaning 49\u003c\/p\u003e \u003cp\u003e3.1.3 Exercise 1 50\u003c\/p\u003e \u003cp\u003e3.1.4 Inlet Filtration 50\u003c\/p\u003e \u003cp\u003e3.1.5 Gas Turbine Performance Measurement 52\u003c\/p\u003e \u003cp\u003e3.2 Case Study Details 53\u003c\/p\u003e \u003cp\u003e3.2.1 Derivative of the Cost Function 54\u003c\/p\u003e \u003cp\u003e3.2.2 Exercise 2 55\u003c\/p\u003e \u003cp\u003e3.2.3 Linear Programming 56\u003c\/p\u003e \u003cp\u003e3.2.4 New Methods – New Thinking 56\u003c\/p\u003e \u003cp\u003e3.2.5 Exercise 3: Gas Turbine Inlet Filtration Upgrade 57\u003c\/p\u003e \u003cp\u003e3.2.6 Presenting Results 57\u003c\/p\u003e \u003cp\u003e3.3 Case Study Results \/ Closure 58\u003c\/p\u003e \u003cp\u003e3.4 Symbols and Abbreviations 60\u003c\/p\u003e \u003cp\u003e3.5 Answer Key 60\u003c\/p\u003e \u003cp\u003eReferences 63\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 4 Flow Instrument Degradation, Use and Placement 64\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e4.1 Background 65\u003c\/p\u003e \u003cp\u003e4.1.1 Nuclear Steam Power Cycles 65\u003c\/p\u003e \u003cp\u003e4.1.2 Core Power-Level Measurement 67\u003c\/p\u003e \u003cp\u003e4.1.3 Differential Pressure Flow Measurement Devices 67\u003c\/p\u003e \u003cp\u003e4.1.4 Two-Phase Piping Pressure Drop 71\u003c\/p\u003e \u003cp\u003e4.1.5 Uncertainty 71\u003c\/p\u003e \u003cp\u003e4.2 Case Study Details 72\u003c\/p\u003e \u003cp\u003e4.3 Exercises 73\u003c\/p\u003e \u003cp\u003e4.3.1 Uncertainty 74\u003c\/p\u003e \u003cp\u003e4.3.2 Conclusions 76\u003c\/p\u003e \u003cp\u003e4.4 Closure 76\u003c\/p\u003e \u003cp\u003e4.5 Symbols and Abbreviations 76\u003c\/p\u003e \u003cp\u003e4.6 Answer Key 77\u003c\/p\u003e \u003cp\u003e4.7 Further Reading 79\u003c\/p\u003e \u003cp\u003eReferences 79\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 5 Two-Phase Hydraulics 80\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e5.1 Background 81\u003c\/p\u003e \u003cp\u003e5.1.1 Reading Assignment 83\u003c\/p\u003e \u003cp\u003e5.1.2 Müller-Steinhagen and Heck 83\u003c\/p\u003e \u003cp\u003e5.1.3 Void Fraction 84\u003c\/p\u003e \u003cp\u003e5.1.4 Pumping Net Positive Suction Head Required 86\u003c\/p\u003e \u003cp\u003e5.1.5 Projects 86\u003c\/p\u003e \u003cp\u003e5.2 Case Study Details 89\u003c\/p\u003e \u003cp\u003e5.3 Exercises 90\u003c\/p\u003e \u003cp\u003e5.3.1 Liquid Flow to Reboiler 90\u003c\/p\u003e \u003cp\u003e5.3.2 Two-Phase Flow from Reboiler 90\u003c\/p\u003e \u003cp\u003e5.3.3 Pump Suction 91\u003c\/p\u003e \u003cp\u003e5.3.4 Discuss 92\u003c\/p\u003e \u003cp\u003e5.4 Closure 92\u003c\/p\u003e \u003cp\u003e5.5 Symbols and Abbreviations 92\u003c\/p\u003e \u003cp\u003e5.6 Answer Key 93\u003c\/p\u003e \u003cp\u003eReferences 94\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 6 Reliability and Availability 95\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e6.1 Background 96\u003c\/p\u003e \u003cp\u003e6.1.1 Models 97\u003c\/p\u003e \u003cp\u003e6.1.2 Availability: Planned and Unplanned Outages – Parallel Systems 100\u003c\/p\u003e \u003cp\u003e6.1.3 Series and Parallel Processes 102\u003c\/p\u003e \u003cp\u003e6.1.4 Stochastic Models 103\u003c\/p\u003e \u003cp\u003e6.1.5 Reading 104\u003c\/p\u003e \u003cp\u003e6.1.6 Applicability 104\u003c\/p\u003e \u003cp\u003e6.2 Case Study Details 105\u003c\/p\u003e \u003cp\u003e6.2.1 Initial Block Flow Diagram 105\u003c\/p\u003e \u003cp\u003e6.2.2 Business Structure 106\u003c\/p\u003e \u003cp\u003e6.2.3 Modified Block Flow Diagram 108\u003c\/p\u003e \u003cp\u003e6.2.4 Other Considerations 108\u003c\/p\u003e \u003cp\u003e6.2.5 Exercises 109\u003c\/p\u003e \u003cp\u003e6.3 Closure 110\u003c\/p\u003e \u003cp\u003e6.4 Symbols and Abbreviations 110\u003c\/p\u003e \u003cp\u003e6.5 Answer Key 111\u003c\/p\u003e \u003cp\u003eReference 113\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 7 Efficiency and Air Emissions 114\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e7.1 Background 115\u003c\/p\u003e \u003cp\u003e7.1.1 Cogeneration or CHP 115\u003c\/p\u003e \u003cp\u003e7.1.2 Environmental Considerations 116\u003c\/p\u003e \u003cp\u003e7.1.3 Efficiency 118\u003c\/p\u003e \u003cp\u003e7.2 Case Study Details 119\u003c\/p\u003e \u003cp\u003e7.2.1 General 119\u003c\/p\u003e \u003cp\u003e7.2.2 Proposed CHP Plant 120\u003c\/p\u003e \u003cp\u003e7.2.3 Steam Boilers 121\u003c\/p\u003e \u003cp\u003e7.2.4 Fuel 121\u003c\/p\u003e \u003cp\u003e7.2.5 Gas Turbine 121\u003c\/p\u003e \u003cp\u003e7.2.6 Air 123\u003c\/p\u003e \u003cp\u003e7.3 Refresher 123\u003c\/p\u003e \u003cp\u003e7.3.1 Gas Mixture Molecular Weight 123\u003c\/p\u003e \u003cp\u003e7.3.2 Gas Mixture Heating Value 123\u003c\/p\u003e \u003cp\u003e7.3.3 Species Weight Fraction 123\u003c\/p\u003e \u003cp\u003e7.3.4 Ultimate Analysis 124\u003c\/p\u003e \u003cp\u003e7.4 Objective 124\u003c\/p\u003e \u003cp\u003e7.5 Exercises 125\u003c\/p\u003e \u003cp\u003e7.5.1 Outside Reading 125\u003c\/p\u003e \u003cp\u003e7.5.2 Boiler Operation 125\u003c\/p\u003e \u003cp\u003e7.5.3 Cogeneration Plant 126\u003c\/p\u003e \u003cp\u003e7.5.4 Conclusion 126\u003c\/p\u003e \u003cp\u003e7.6 Closure 126\u003c\/p\u003e \u003cp\u003e7.7 Symbols and Abbreviations 127\u003c\/p\u003e \u003cp\u003e7.8 Answer Key 127\u003c\/p\u003e \u003cp\u003eReferences 130\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 8 Low-Carbon Power Production 131\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e8.1 Background 132\u003c\/p\u003e \u003cp\u003e8.1.1 Dispatch and Renewable Power Resources 133\u003c\/p\u003e \u003cp\u003e8.1.2 Capacity Factor and Availability Factor 134\u003c\/p\u003e \u003cp\u003e8.1.3 Fuel Costs (FC in Equation (8.1)) 134\u003c\/p\u003e \u003cp\u003e8.1.4 Capital Cost Recovery (CR in Equation (8.1)) 135\u003c\/p\u003e \u003cp\u003e8.1.5 Nonfuel Operations and Maintenance (M in Equation (8.1)) 135\u003c\/p\u003e \u003cp\u003e8.1.6 Regulation and Government Support 135\u003c\/p\u003e \u003cp\u003e8.2 Refresher 136\u003c\/p\u003e \u003cp\u003e8.2.1 Short-Run Marginal Cost 136\u003c\/p\u003e \u003cp\u003e8.2.2 CO2 Emissions 136\u003c\/p\u003e \u003cp\u003e8.2.3 Long-Run Marginal Cost 136\u003c\/p\u003e \u003cp\u003e8.3 Case Study Details 136\u003c\/p\u003e \u003cp\u003e8.3.1 Reading Assignment 137\u003c\/p\u003e \u003cp\u003e8.3.2 Transmission Costs 138\u003c\/p\u003e \u003cp\u003e8.3.3 Economic Models 139\u003c\/p\u003e \u003cp\u003e8.3.4 Carbon Emissions 139\u003c\/p\u003e \u003cp\u003e8.3.5 Understanding the Findings 140\u003c\/p\u003e \u003cp\u003e8.3.6 Explaining the Results 141\u003c\/p\u003e \u003cp\u003e8.4 Closure 141\u003c\/p\u003e \u003cp\u003e8.5 Answer Key 142\u003c\/p\u003e \u003cp\u003eReferences 144\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 9 Heat Exchangers and Drain Line Sizing 146\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e9.1 Background 147\u003c\/p\u003e \u003cp\u003e9.1.1 Steam Surface Condensers 147\u003c\/p\u003e \u003cp\u003e9.1.2 Feedwater Heaters 151\u003c\/p\u003e \u003cp\u003e9.1.3 Overall Heat Transfer Coefficient 152\u003c\/p\u003e \u003cp\u003e9.1.4 Condensing Heat Transfer 153\u003c\/p\u003e \u003cp\u003e9.1.5 Forced Convection Inside Tubes 153\u003c\/p\u003e \u003cp\u003e9.1.6 Conduction Heat Transfer 153\u003c\/p\u003e \u003cp\u003e9.1.7 Off-Design Exchanger Performance 154\u003c\/p\u003e \u003cp\u003e9.1.8 Drain Line Sizing 155\u003c\/p\u003e \u003cp\u003e9.2 Reading 155\u003c\/p\u003e \u003cp\u003e9.3 Case Study Details 156\u003c\/p\u003e \u003cp\u003e9.3.1 Flow Diagram and Equipment 156\u003c\/p\u003e \u003cp\u003e9.3.2 Design Cases 157\u003c\/p\u003e \u003cp\u003e9.3.3 Exercises 159\u003c\/p\u003e \u003cp\u003e9.4 Closure 160\u003c\/p\u003e \u003cp\u003e9.5 Symbols and Abbreviations 161\u003c\/p\u003e \u003cp\u003e9.6 Answer Key 162\u003c\/p\u003e \u003cp\u003e9.7 Further Reading 164\u003c\/p\u003e \u003cp\u003eReferences 164\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 10 Optimized Maintenance 165\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e10.1 Background 166\u003c\/p\u003e \u003cp\u003e10.1.1 Maintenance Practices 166\u003c\/p\u003e \u003cp\u003e10.1.2 Economic Model for Maintenance 167\u003c\/p\u003e \u003cp\u003e10.1.3 Operating Costs other than Maintenance 168\u003c\/p\u003e \u003cp\u003e10.2 Refresher 169\u003c\/p\u003e \u003cp\u003e10.2.1 Cost to Generate Power 169\u003c\/p\u003e \u003cp\u003e10.2.2 Fixed and Variable Operations and Maintenance (O\u0026amp;M) 169\u003c\/p\u003e \u003cp\u003e10.2.3 Cost of Fuel 169\u003c\/p\u003e \u003cp\u003e10.2.4 Short]Run Gross Margin 169\u003c\/p\u003e \u003cp\u003e10.3 Presentation Techniques 169\u003c\/p\u003e \u003cp\u003e10.3.1 Waterfall Chart 169\u003c\/p\u003e \u003cp\u003e10.3.2 Line and Scatter Plots 171\u003c\/p\u003e \u003cp\u003e10.4 Reading 171\u003c\/p\u003e \u003cp\u003e10.4.1 Questions 171\u003c\/p\u003e \u003cp\u003e10.5 Case Study Details 172\u003c\/p\u003e \u003cp\u003e10.5.1 Data 172\u003c\/p\u003e \u003cp\u003e10.5.2 Exercises 174\u003c\/p\u003e \u003cp\u003e10.6 Closure 176\u003c\/p\u003e \u003cp\u003e10.7 Symbols and Abbreviations 176\u003c\/p\u003e \u003cp\u003e10.8 Answer Key 177\u003c\/p\u003e \u003cp\u003e10.9 Further Reading 184\u003c\/p\u003e \u003cp\u003eReferences 185\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 11 Project Engineering 186\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e11.1 Opening 186\u003c\/p\u003e \u003cp\u003e11.2 Background 187\u003c\/p\u003e \u003cp\u003e11.2.1 Mustard 187\u003c\/p\u003e \u003cp\u003e11.2.2 Working with Warfare Agents 188\u003c\/p\u003e \u003cp\u003e11.2.3 Alternative Technology for HD Decontamination 189\u003c\/p\u003e \u003cp\u003e11.3 Project Planning and Definition 189\u003c\/p\u003e \u003cp\u003e11.3.1 Project Management 192\u003c\/p\u003e \u003cp\u003e11.3.2 Client Requirements 192\u003c\/p\u003e \u003cp\u003e11.3.3 Work Breakdown Structure 194\u003c\/p\u003e \u003cp\u003e11.3.4 Growing the Team 195\u003c\/p\u003e \u003cp\u003e11.3.5 Process Basis of Design 196\u003c\/p\u003e \u003cp\u003e11.4 Executing the Project 197\u003c\/p\u003e \u003cp\u003e11.4.1 The Process 198\u003c\/p\u003e \u003cp\u003e11.4.2 Stakeholder Communication 198\u003c\/p\u003e \u003cp\u003e11.4.3 Ton Container Cleanout 199\u003c\/p\u003e \u003cp\u003e11.4.4 Demonstration Tests 199\u003c\/p\u003e \u003cp\u003e11.4.5 Materials of Construction 200\u003c\/p\u003e \u003cp\u003e11.4.6 Unexpected Events 201\u003c\/p\u003e \u003cp\u003e11.5 Closure 201\u003c\/p\u003e \u003cp\u003e11.6 Answer Key 202\u003c\/p\u003e \u003cp\u003eReference 208\u003c\/p\u003e \u003cp\u003e\u003cb\u003eCase 12 In the Woodshop 209\u003c\/b\u003e\u003c\/p\u003e \u003cp\u003e12.1 Background 211\u003c\/p\u003e \u003cp\u003e12.1.1 Band Saw 211\u003c\/p\u003e \u003cp\u003e12.1.2 Table Saws 211\u003c\/p\u003e \u003cp\u003e12.1.3 The Router 213\u003c\/p\u003e \u003cp\u003e12.1.4 Safety 214\u003c\/p\u003e \u003cp\u003e12.1.5 Measurements 214\u003c\/p\u003e \u003cp\u003e12.2 Case Study Details 214\u003c\/p\u003e \u003cp\u003e12.2.1 Exercise 215\u003c\/p\u003e \u003cp\u003e12.2.2 The Cove 215\u003c\/p\u003e \u003cp\u003e12.2.3 Extra Credit 217\u003c\/p\u003e \u003cp\u003e12.3 Closure 217\u003c\/p\u003e \u003cp\u003e12.4 Glossary 219\u003c\/p\u003e \u003cp\u003e12.5 Solutions 219\u003c\/p\u003e \u003cp\u003e12.6 Further Reading 220\u003c\/p\u003e \u003cp\u003eReferences 221\u003c\/p\u003e \u003cp\u003eAppendix 222\u003c\/p\u003e \u003cp\u003eGlossary 225\u003c\/p\u003e \u003cp\u003eIndex 235\u003c\/p\u003e","brand":"John Wiley \u0026 Sons Inc","offers":[{"title":"Default Title","offer_id":49528847499607,"sku":"9781119119746","price":78.95,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0817\/1739\/5799\/files\/9781119119746.jpg?v=1731873258","url":"https:\/\/bookcurl.com\/products\/case-studies-in-mechanical-engineering-9781119119746","provider":"Book Curl","version":"1.0","type":"link"}